DOI QR코드

DOI QR Code

The Effects of Optical Cable Fault on Customer Complaints

광케이블 고장이 고객 불만에 미치는 영향 연구

  • Jung, So-Ki (Seoul School of Integrated Sciences & Technologies,) ;
  • Cha, Kyoung Cheon (Dong-A University Department of Business Administration)
  • Received : 2014.11.21
  • Accepted : 2015.01.26
  • Published : 2015.02.28

Abstract

In this paper, we are aim to analysis the effects of optical cable fault on customer complaints. We considered several causes: the elapse time to allow repair from the optical cable fault, whether working day or not, seasonality and human error, external construction, optical cable cutting or core banding that is controllable causes and natural disasters, vehicle crash, fire that is uncontrollable causes. The results of analysis are as follows: First, customer complaints increase through indifferencial relationship when using the production function for the number of expected victims and elapsed time due to the optical cable fault. Second, not only the elapsed time but also controllable variables, human error, external construction, the core cut occurs, increased customer complaints due to optical cable faults.

본 연구는 광케이블 고장이 발생하였을 때 예상 피해 고객과 고장 처리 지연시간이 고객 불만 증가에 미치는 영향을 분석하고자 한다. 광케이블 고장을 복구시키는데 소요되는 시간, 근무 요일여부, 계절성을 함께 고려하였고, 작업자 부주의로 인한 고장, 외부 공사, 코어 단선 및 밴딩 등 관리 가능 항목 고장과 자연재해, 차량추돌, 화재 등 관리 불가능한 변수를 구분하였다. 광케이블 고장 증가의 실증 분석 결과는 다음과 같다. 첫째, 광케이블 고장에 의한 피해 고객수와 복구 시간에 대해서 생산 함수를 이용하였을 때 고객 불만이 무차별하게 증가 하는 것을 알 수 있었다. 둘째, 광케이블 고장처리 뿐만이 아니고 현장에서 관리 가능한 변수인 작업 장애, 외부 공사, 코어 단선이 발생하면 고객 불만을 증가 시켰다.

Keywords

References

  1. J. C. Kim, T. M. Ann, J, S, Lee, and Y. G. O, "A study on service connection maintenance for network fault," ETRI, pp. 10- 83, 1999.
  2. L. N. Cassel and C. Partridge, "Network management architectures and Protocols: problems and approaches," IEEE J. Sel. Areas in Commun., vol. 7, no. 7, pp. 1104-1114, Sept. 1989. https://doi.org/10.1109/49.44558
  3. F. RK. Chung, "Reliable software and communication. I: An overview," IEEE J. Sel. Areas in Commun., vol. 12, no. 1, pp. 23-32, Jan. 1994. https://doi.org/10.1109/49.265700
  4. Y. Yemini, "A critical survey of network management protocol standards," Telecommun. Network, Management into the 21st Century(s. Aidarous and T. Plevyak, Eds), IEEE Press, 1994.
  5. S. K. Jung and K. C. Cha, "A study on the learning curve and VOC factors affecting of telecommunication services," J. KICS, vol. 38B, no. 8, pp. 518-525, Aug. 2014.
  6. F. R. Dwyer, H. S. Paul, and S. Oh, "Developing buyer-seller relationship," The J. Marketing, vol. 51, pp. 11-27, Apr. 1987. https://doi.org/10.2307/1251126
  7. P. Carer, "Probabilistic method used in asset management for MV electrical equipment as EDF," 9th Int. Conf. Probabilistic Methods Appl. to Power Syst. (PMAPS 2006), Stockholm, Sweden, pp. 1-5, 2006.
  8. B. W. Meeusen and J. van den Broeck, "Efficiency estimation from cobb-douglas production functions with composed error," Int. Economic Rev., vol. 18, no. 2, pp. 435- 443, Jun. 1977. https://doi.org/10.2307/2525757
  9. E. W. Anderson, C. Fornell, and D. R. Lehmann, "Customer satisfaction, market share, and profitability: Findings form sweden," The J. Marketing, vol. 58, no. 3, pp. 53-66, Jul. 1994. https://doi.org/10.2307/1252310
  10. C. W. Cobb and P. H. Douglas, "A theory of production," Am. Econ. Rev., vol. 18, no. 1, pp. 139-165, 1928.
  11. Y. G. Lu, X. P. Zhang, Y. M. Dong, F. Wang, and Y. H. Liu, "Optical cable fault locating using brillouin optical time domain reflectometer and cable localized heating method," J. Physics: Conf. Series, vol. 48, no. 1, pp. 1387-1394, 2006. https://doi.org/10.1088/1742-6596/48/1/257
  12. S. K. Kim, "Cost-Savings in mergers between piano manufacturers," Korea Econ. Res. Inst., vol. 17, no. 2, pp. 83-95, Dec. 2008.
  13. A. N. Hiroijji and H. S. Jung, New element&industrial 10 : Fiber∙Optical Cable Carrying a dream of multimedia, Iljinsa, Jun. 2010.
  14. L. L. Berry and A. Parasuraman, Marketing services: Competing through quality, New York: the Free Press, 1991.
  15. S. O. Kim, S. C. Kim, H. T. Kim, and B. S. Sung, Service Operation Management, Hangyeongsa, pp. 182-186, 2004.
  16. VOC Management Research Society, Voice of The Customer, KMAC, pp. 4-140, Apr. 2013.
  17. J. M. Henderson and R. E. Quandt, Microeconomic theory: A mathematical approach, NY: McGraw-Hill, pp. 67-70, 1971.
  18. G. S. Shim, C. S. Park, Y. H. Lee, T. H. Lee, J. P. Chu, J. G. Cha, and H. J. Hwang, Microeconomics, Beomhanseojeok, pp. 260-270, Sept. 2011.
  19. J. W. Kim, K. H. Kim, D. Y. Jeon, G. B. Lee, S. H. Seok, and B. D. Chung, "A study on SOP for efficient resolution of trouble tickets," in Proc. KICS Summer. Conf., pp. 1279-1280, Jun. 2009.
  20. I. C. Kim, China.The West let out a big burp of innovation(2013), Retrieved Dec., 1, from http://news.mk.co.kr/column/view.php?year=2013&no=1214418.
  21. S. W. Chang, Fiber Line Monitoring and Management System(2010), Retrieved Oct., 18, from http://www.koit.co.kr/news/articleView.html?idxno=35931.
  22. http://en.wikipedia.org/wiki/Learning_curve.