참고문헌
- 김여근, 이상선, "다목적을 갖는 혼합모델 조립라인의 밸런싱과 투입순서를 위한 공생 진화알고리즘", 한국경영과학회지, 제35권, 제3호(2010), pp.25-43.
- 김광희, "다목적함수 기반 반도체 생산 공정 스케줄링을 통한 공급사슬관리의 최적화 연구", 경북대학교 경영학석사 학위논문, 2013.
- 정재우, 허연호, "운송시간의 예측을 통한 물류정체 통제 모형", 경영과학, 제29권, 제1호(2012), pp.131-141. https://doi.org/10.7737/KMSR.2012.29.1.131
- 주병준, 김영대, 방준영, "대기시간 제약을 고려한 반도체 웨이퍼 생산공정의 스케쥴링 알고리듬", 대한산업공학회지, 제35권, 제4호(2009), pp.266-279.
- Bukchin, J. and M. Masin, "Multi-objective lot splitting for a single product m-machine flowshop line," IIE Transactions, Vol.36, No.2(2003), pp.191-202. https://doi.org/10.1080/07408170490245487
- Bukchin, J. and M. Masin, "Multi-objective lot splitting for a single product m-machine flowshop line," IIE Transactions, Vol.36, No.2(2004), pp.191-202. https://doi.org/10.1080/07408170490245487
- Cho, H.M., S.J. Bae, J. Kim, and I.J. Jeong, "Bi-objective scheduling for reentrant hybrid flow shop using pareto," Computers and Industrial Engineering, Vol.61, No.3(2011), pp.529-541. https://doi.org/10.1016/j.cie.2011.04.008
- Chung, J. and J. Jang, "A WIP balancing procedure for throughput maximization in semiconductor fabrication," IEEE Transactions on Semiconductor Manufacturing," Vol.22, No.3(2009), pp.381-390. https://doi.org/10.1109/TSM.2009.2017666
- Cochran, J.K. and H.N. Chen, "Generating daily production plans for complex manufacturing facilities using multi-objective genetic algorithms," International Journal of Production Research, Vol.40, No.16(2002), pp.4147-4167. https://doi.org/10.1080/00207540210146981
- Cochran, J.K., S.M. Horng, and J.W. Fowler, "A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines," Computers and Operations Research, Vol.30, No.7(2003), pp.1087-1102. https://doi.org/10.1016/S0305-0548(02)00059-X
- Guo, R.S., D.M. Chiang, and F.Y. Pai, "Multi-objectives exception management model for semiconductor back-end environment under turnkey service," Production Planning and Control, Vol.18, No.3(2007), pp.203-216. https://doi.org/10.1080/09537280601011019
- Gupta, A.K. and A.I. Sivakumar, "Single machine scheduling with multiple objectives in semiconductor manufacturing," International Journal of Advanced Manufacturing Technology, Vol.26, No.9-10(2005), pp.950-958. https://doi.org/10.1007/s00170-004-2074-y
- Kim, S., S.H. Yea, and B. Kim, "Shift scheduling for steppers in the semiconductor wafer fabrication process," IIE Transactions, Vol.34, No.2(2002), pp.167-178. https://doi.org/10.1080/07408170208928859
- Lee, Y.H., "Supply chain model for the semiconductor industry of global market," Journal of Systems Integration, Vol.10, No.3(2001), pp. 189-206. https://doi.org/10.1023/A:1011297726485
- Lee, Y.H., J. Park, and S. Kim, "Experimental study on input and bottleneck scheduling for a semiconductor fabrication line," IIE Transactions, Vol.34(2001), pp.79-190.
- Liu, H., Z. Jiang, and R.Y. Fung, "Performance modeling, real-time dispatching and simulation of wafer fabrication systems using timed extended object-oriented Petri nets," Computers and Industrial Engineering, Vol.56, No.1 (2009), pp.121-137. https://doi.org/10.1016/j.cie.2008.04.006
- Mason, S.J., M.E. Kurz, M.E. Pfund, J.W. Fowler, and L.M. Pohl, "Multi-objective semiconductor manufacturing scheduling : a random keys implementation of NSGA-II," Computational Intelligence in Scheduling, 2007, pp.159-164.
- Monch, L., J.W. Fowler, S. Dauzere-Peres, S.J. Mason, and O. Rose, "A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations," Journal of Scheduling, Vol.14, No.6(2011), pp.583-599. https://doi.org/10.1007/s10951-010-0222-9
- Senties, O.B., C. Azzaro-Pantel, L. Pibouleau, and S. Domenech, "A neural network and a genetic algorithm for multi objective scheduling of semiconductor manufacturing plants," Industrial and Engineering Chemistry Research, Vol.48, No.21(2009), pp.9546-9555. https://doi.org/10.1021/ie8018577
- Yann, C. and S. Ratrick, "Multiobjective optimization-principles and case studies," Springer Science and Business Media, 2013.
- Yao, S., Z. Jiang, N. Li, N. Geng, and X. Liu, "A decentralised multi-objective scheduling methodology for semiconductor manufacturing," International Journal of Production Research, Vol.49, No.24(2011), pp.7227-725. https://doi.org/10.1080/00207543.2010.535040
피인용 문헌
- Research Trends of Scheduling Techniques for Domestic Major Industries vol.41, pp.1, 2018, https://doi.org/10.11627/jkise.2018.41.1.059