Abstract
This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.
본 연구는 2주탑 3경간 사장교의 사업기획 단계에서 3차원 모델정보에 기반하여 신속한 개략 공사비 및 물량 산정을 지원하는 시스템을 개발하였다. 우선, 기 설계된 사장교 설계정보(구조계산서, 도면, 수량)를 분석하여 설계변수를 도출하였다. 도출된 설계변수를 기반으로 매개변수적으로 사장교를 3차원 모델링하는 BIM Wizard를 개발하였다. BIM Wizard를 이용해 작성된 3차원 모델로부터 사장교의 주요 재료에 대한 수량을 직접 산출하며, 케이블 교량에 대한 단가 D/B와 산출된 수량을 연계하여 개략공사비를 산정할 수 있다. 결과적으로, 사업 초기단계에서 m당 혹은 $m^2$당 실적 평균공사비를 산출하는 재래적인 방식보다 더 구체화된 공사비를 산출할 수 있는 시스템을 구축하였다. 이로써, 우리는 사장교에 대해 입찰단계에서 가능한 신속하게 다양한 대안을 검토할 수 있을 것이다.