참고문헌
- Akinci, B., Fischer, M. and Kunz, J. (2002). "Automated generation of work space required by construction acitivies." Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 306-315. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(306)
- An, S. H., Kim, J. H. and Kang, K. I. (2006). "A study on the measures for work interference reduction in apartment construction." Journal of The Korean Institute of Building Construction, Vol. 6, No. 1, pp. 117-122. https://doi.org/10.5345/JKIC.2006.6.1.117
- Chavada, R., Dawood, N. and Kassem, M. (2012). "Construction workspace management: The Development and Application of a Novel nD Planning Approach and Tool." Journal of Information Technology in Construction, Vol. 17, pp. 213-236.
- Choi, B. J., Lee, H. S., Park, M. S., Kim, H. S. and Hwang, S. J. (2013). "4D BIM based workspace planning process in building construction project." Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 175-187. https://doi.org/10.6106/KJCEM.2013.14.5.175
- Chua, D., Yeoh, K. and Song, Y. (2010). "Quantification of spatial temporal congestion in Four-dimensional computer-aided design." Journal of Construction Engineering and Management, ASCE, Vol. 130, pp. 598-606.
- Guo, S. J. (2002). "Identification and resolution of workspace conflicts in building construction." Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 287-295. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(287)
- Hammad, A., Zhang, C., Mohamed, A. H. and Cardianl, G. (2007). "Equipment workspace analysis in infrastructure projects." Canadian Journal of Civil Engineering, Vol. 34, No. 10, pp. 1247-1256. https://doi.org/10.1139/l07-048
- I-Chen, W. and Yen-Chang, C. (2010). "4D workspace conflict detection and analysis system." Proceedings of 10th International Conference on Construction Applications of Virtual Reality, Japan.
- Jang, S. J., Jeon, H. J., Shim, T. B., Eom, S. J., Yun, S. H. and Paek, J. H. (2008). "A study on the tower-crane equipment planning support system in the BIM environment." Journal of Korean Society of Civil Engineers, Vol. 24, No. 7, pp. 109-116.
- Kamat, V. and Martinez, J. (2005). "Dynamic 3D visualization of articulated construction equipment." Journal of Computing in Civil Engineering, ASCE, Vol. 19, No. 4, pp. 356-368. https://doi.org/10.1061/(ASCE)0887-3801(2005)19:4(356)
- Kang, L. S., Moon, H. S., Kim, H. S. and Kwak, J. M. (2013). "Usability improvement of BIM for construction projects using active BIM functions." Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 74-83. https://doi.org/10.6106/KJCEM.2013.14.5.074
- Kim, H. S., Cho, B. N., Yun, S. Y., Kim, Y. H., Moon, H. S. and Kang, L. S. (2014). "A study on 3D modling and optimization of workspace considering work type in construction projects." Proceedings of KIBIM Annual Conference 2014, KIBIM, KOFST, Vol. 4, No. 1, pp. 25-26
- Mallasi, Z. (2006). "Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation." Automation in Construction, Vol. 15, No. 5, pp. 640-655. https://doi.org/10.1016/j.autcon.2005.08.005
- Moon, H. S., Dawood, N. and Kang, L. S. (2014). "Development of workspace conflict visualization system using 4D object of work schedule." Advanced Engineering Informatics 28, pp. 50-65. https://doi.org/10.1016/j.aei.2013.12.001
- Moon, H. S., Kang, L. S. and Dawood, N. (2010). "Development of a workspace conflict verification model for temporary facilities based on a VR simulation." Proceedings of The International Conference on Computing in Civil and Building Engineering, University of Nottingham, UK.
- Moon, H. S., Kim, H. S., Kang, L. S. and Kim, B. S. (2013). "A simulation model for deciding an optimized 3D shape of construction workspace considering resources in BIM environment." Proceedings of 15th International Conference on Construction Engineering and Project Management (ICCEPM-2013)
- Riley. D. and Sanvido. V. (1997). "Space planning method for multi-story building construction." Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 2, pp. 171-180. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:2(171)
- Seo, J. H. (2012). A collaborative process of BIM-based clash detection for the constructability review, Master Thesis, Hanyang University.
- Song, D. H., Lee, S. B. and Song, H. S. (2011). "A study on the secure method of construction workspace by using building information modeling." Proceeding of the KIC, Vol. 11, No. 2, pp. 9-10.
- Tantisevi, K. and Akinci, B. (2007). "Automated generation of workspace requirements of mobile crane operations to support conflict detection." Automation in Construction, Vol. 16, No. 3, pp. 262-276. https://doi.org/10.1016/j.autcon.2006.05.007
- Yeo, E. S. (2002). Efficient real-time collision detection method using sampling tree, Master Thesis, Sungkyunkwan University.