DOI QR코드

DOI QR Code

A Study on Improvement Plan of BIM-based Design Process using DSM -Focus on the Criteria Design Phase-

DSM을 활용한 BIM 기반 설계업무프로세스 정립 및 개선을 위한 연구 -기본설계단계를 중심으로-

  • Jeong, Young-Ho (Department of Frontier Architectural and Urban Environmental Engineering, Hanyang University) ;
  • Lee, Ju-Sung (Department of Architectural Environmental Engineering, Hanyang University) ;
  • Ham, Nam-Hyuk (Department of Architectural Environmental Engineering, Hanyang University) ;
  • Kim, Ju-Hyung (Department of Architectural Engineering, Hanyang University) ;
  • Kim, Jae-Jun (Department of Architectural Engineering, Hanyang University)
  • 정영호 (한양대학교 대학원 건축 및 도시환경 공학) ;
  • 이주성 (한양대학교 대학원 건축환경공학과) ;
  • 함남혁 (한양대학교 대학원 건축환경공학과) ;
  • 김주형 (한양대학교 공과대학 건축공학부) ;
  • 김재준 (한양대학교 공과대학 건축공학부)
  • Received : 2014.09.17
  • Accepted : 2014.11.13
  • Published : 2014.12.01

Abstract

There are many agendas and discussion subjects for BIM-based Criteria Design phase. At that time, some problems are occurred by software compatibility, simple repetitive tasks, rework caused by missing information etc. In this study, we focus on solving that problems by applying API(Application Programming Interface) method. For effective study, we construct Criteria Design process by using DSM (Dependency Structure Matrix) and study applicability of API. It will be effective for time-consuming task and simply labor-intensive tasks by applying API. we expect improving BIM-based Design Process and Data quality, work productivity without missing information and shapes for using API.

Keywords

References

  1. Na, K.-J., 2008, Development of a Conceptual Process Model for BIM Application in Korean Construction Industry, The Korea Institute of Building Construction, 10(1), pp.649-653.
  2. Lee, B.-H., 2010, BIM Application for the Structural Engineering Field in Korea, The Architectural Institute of Korea, 54(1), pp.52-57.
  3. Kim, B.-K. and Kim, K.-C., 2009, A Study on Level of Information Which Integrated Design Process for BIM Application - Focus on the Level of Information Which Finland and Denmark BIM Guideline, The Architectural Institute of Korea, 29(1), pp.317-321.
  4. Seo, C.-S., 2010, Application of BIM-Based Integrated Building Design Process at the Design Phase, The Korea Institute of Building Construction, 10(1), pp.195-199.
  5. Kim, W.-S., 2010, Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies, The Architectural Institute of Korea, 54(1), pp.65-69.
  6. Park, C.-H., 2010, Management of Design and Construction Information of Building Structures Based on IFC, Computational Structural Engineering Institute of Korea, 2010(6), pp.1422-1429.
  7. Lee, J.-H. and Jun, H.-J., 2007, A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms, Korean Institute of Interior Design Journal, 16(6), pp.19-27.
  8. Lee, S.-H., 2010, Analysis of the Process Modeling Methods for Capturing Collaborative Processes, Korean Institute of Industrial Engineers, 2010(6), pp.1422-1429.
  9. Chang, S.-H., 2009, Tower Crane Operation Management Using the Dependency Structure Matrix, Seoul National University.
  10. Browning, 2001, Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions, IEEE Transactions on Engineering Management, 48(3).
  11. Choo, S.-Y., 2012, A Study on LOD(Level of Development) for Development of Green BIM Guidelines - Focused on Energy Performance Estimation, The Architectural Institute of Korea, 28(6), pp.37-47.
  12. Kim, J.-W., 2009, A Study on the Development of the Problem Improvement Directions in Enhancing BIM Data Interoperability through IFC, Korea Institute of Construction Engineering and Management, 10(6), pp.88-99.
  13. Sang, J., 2011, Data Management in BIM-based Design Project, Korean Institute of BIM, 1(1), pp.91-92.
  14. Lim, C.-W., 2010, Analysis for BIM Object Information Compatibility Problem Classification Among BIM Softwares, The Korea Institute of Building Construction, 10(6), pp.257-260.
  15. Eastman, Chunk, Teicholz, Paul, Sacks, Rafeal, and Liston, Kathleen, BIM Handbook, John Wiley & Sons, Inc, New Jersey, 2008.
  16. Jung, S.-W., 2011, A Study on Introducing The Integrated Building Design Process in Domestic Construction Industries Through BIM-API Cases, The Architectural Institute of Korea, 31(1), pp.59-60.
  17. Park, G.-B., 2013, A Study of the using API for Improving Productivity in Construction Engineering, Korean Institute of BIM, 3(3), pp.46-55. https://doi.org/10.13161/kibim.2013.3.3.029
  18. Kim, Y.-S., 2010, Integrated Project Delivery (IPD) / New Paradigm of Project Delivery System for BIM Based Construction Projects; Integrated Project Delivery(IPD) System, The Architectural Institute of Korea, 54(1), pp.37-40.
  19. Park, M.-S., 2012, BIM Design Management Process Using the Dependency Structure Matrix at the Introduction Phase, The Architectural Institute of Korea, 28(1), pp.37-45.
  20. Yun, J.Y., 2009, A Study on an Optimal Plant Design Collaboration System Using a Design Structure Matrix, Journal of the Korean Society of Civil Engineers, 33(1), pp.337-346. https://doi.org/10.12652/Ksce.2013.33.1.337
  21. Ahn, H.-K., 2013, A Study on Improvement of Implementation Documents using DSM (Design Structure Matrix), The Architectural Institute of Korea, 29(3), pp.173-181.
  22. Chang, S.-H. 2009, A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix (DSM), Korean Institute of Construction Engineering and Management, 7, pp.682-686.
  23. Standards for Architectural Design Service and Its Fee 2002, Ministry of Construction & Transportation notified 2002-270.
  24. AIA Document E202TM-2008, 2008, AIA (American Institute of Architects)
  25. AIA California Council, Intergrated Project Delivery, 2007, Organizing the Development of a Building Information Model, AIA California Council The American Institute of Architects.
  26. Yassine, A., 2003 Complex Concurrent Engineering and the Design Structure Matrix Method, Published by SAGE.
  27. Maheswari, U., 2005, A Structured Approach to Form Dependency Structure Matrix for Construction Projects", 22nd International Symposium on Automation and Robotics in Construction.
  28. Danilovic, M., 2007, Managing Complex Product and Domain Mapping Matrices, International Journal of Project Management.
  29. Liang, L.-Y., 2009, Integral Methods of Fuzzy AHP and DSM for Evaluation in Partitioning Design Team, ICCPM 2009 Jeju, Korea.
  30. Akram, S., 2009, Model for Design Management in Collaborative Environment Using Structure Matrix and Design Parameters' Information, ICCPM 2009 Jeju, Korea.
  31. Kim, Y.-H., 2012, A Study of BIM based Cooperation Process in the Schematic Design Stage, Proceedings of the Society of CAD/CAM Engineers Conference, pp.662-667.
  32. Kim, W.-H., 2012, A Study on the Method for Improving Efficiency of Decision Making in the Phase of Design Development, Proceedings of the Society of CAD/CAM Engineers Conference, pp.641-646.
  33. Kim, J.-W., 2009, A Study on the Development of the Problem Improvement Directions in Enhancing 3D BIM Data Interoperability through IFC, Transactions of the Society of CAD/CAM Engineers, 14(6), pp.390-403.