DOI QR코드

DOI QR Code

Improving the supply level of repair parts

수리부속 적정 보급수준 개선에 관한 연구

  • Received : 2014.07.20
  • Accepted : 2014.09.20
  • Published : 2014.09.30

Abstract

The national Logistics Information system has been rapidly developed on account of the dramatic improvements in the military's logistics support system and supply support system, making a transition from manual work system to computerized work system. Supply level, however, does not reflect these changes in the overall logistics environment and still retains the state it was in the 1970s. This research uses the accumulated data from the equipment maintenance information system developed in the year 2009 to analyze RWT(Requisition Wait Time) and CWT (Customer Wait Time). The analysis estimated the realistic transportation and ordering time and led to the conclusion that the differentiated ASL operation system that considers demand level should be adopted instead of the uniform ASL employment system.

Keywords

References

  1. Army HQ, repair parts doctrine('06. 9. 15)
  2. Army HQ, army regulation 415('12)
  3. Army HQ, army logistics policy and procedure('12. 4)
  4. Army logistics school, Logistics dissertation book volume 15('14. 3)
  5. Army HQ army regulation 427, logistics support achievement management article 6(estimation method based on achievements)

Cited by

  1. 사회연결망분석을 통한 한국군 공급네트워크 구조의 효율성 영향요인 분석 vol.20, pp.5, 2014, https://doi.org/10.5762/kais.2019.20.5.47