References
- Amiri, M. and Mohtashami, A. (2012), Buffer Allocation in Unreliable Production Lines Based on Design of Experiments, Simulation, and Genetic Algorithm. International Journal of Advanced Manufacturing Technology, 62(1-4), 371-383. https://doi.org/10.1007/s00170-011-3802-8
- Chan, F. T. S. and Ng, E. Y. H. (2002), Comparative Evaluations of Buffer Allocation Strategies in a Serial Production Line, International Journal of Advanced Manufacturing Technology, 19(11), 789-800. https://doi.org/10.1007/s001700200090
- Choi, S. D., Kumar, A. R., and Houshyar, A. (2002), A Simulation Study of an Automotive Foundry Plant Manufacturing Engine Blocks, Proceedings of the 2002 Winter Simulation Conference, 1035-1040.
- Dunbar, III, J. F., Liu, J. W. and Williams, E. D. (2009), Simulation of Alternatives for Transmission Plant Assembly Line, Proceedings of the Summer Computer Simulation Conference, 17-23.
- Huang, M. G., Chang, P. L., and Chou, Y. C. (2002), Buffer Allocation in Flow-shop-type Production System with General Arrival and Service Patterns, Computers and Operations Research, 29(2), 103-121. https://doi.org/10.1016/S0305-0548(00)00060-5
- Jayaraman, A. and Agarwal A. (1996), Simulating an Engine Plant, Manufacturing Engineering, 117(5), 60-68.
- Jayaraman, A. and Gunal, A. K. (1997), Applications of Discrete Event Simulation in the Design of Automotive Power Train Manufacturing Systems, Proceedings of the 1997 Winter Simulation Conference, 758-764.
- Kelton, W. D., Sadowski, R. P., and Sadowski, D. A. (2002), Simulation with ARENA 2nd Ed., McGraw Hill, New York, U.S.A.
- Kwon, C. M. and Lim, S. G. (2013), Bottleneck Detection Based on Duration of Active Periods, Journal of the Korea Society for Simulation, 22(3), 35-41. https://doi.org/10.9709/JKSS.2013.22.3.035
- Lawrence, S. R. and Buss, A. H. (1994), Shifting Production Bottlenecks : Cause, Curse and Conundrums, Journal of production and Operations Management, 3(1), 21-37.
- Li, J. and Meerkov, S. M. (2009), Production Systems Engineering, Springer Science+Business Media, New York, U.S.A.
- Li, L., Chang, Q., Xiao, G. X., and Ambani, S. (2011), Throughput Bottleneck Prediction of Manufacturing Systems Using Time Series Analysis, Journal of Manufacturing Science and Engineering, 133(2), DOI:10.1115/1.4003786.
- Moon, D. H., Sung, J. H., and Cho, H. I. (2003), A Case Study on the Verification of the Initial Layout of Engine Block Machining Line Using Simulation, Journal of Korea Society for Simulation, 12(3), 41-53.
- Moon, D. H., Wang, G., and Shin, Y. W. (2012), Effects of Failure Distribution Considering Various Types of Layout Structure in Automotive Engine Shops, Journal of the Korean Institute of Industrial Engineers, 38(1), 7-16. https://doi.org/10.7232/JKIIE.2012.38.1.007
- Powell, S. G. (1994), Buffer Allocation in Unbalanced Three-station Serial Lines, International Journal of Production Research, 32(9), 2201-2217.
- Seong, D., Chang, S. Y., and Hong, Y. (1995), The Buffer Allocation with Linear Resource Constraints in a Continuous Flow Line, Journal of the Korean Institute of Industrial Engineers, 21(4), 541-553.
- So, K. C. (1997), Optimal Buffer Allocation Strategy for Minimizing Work-in-process Inventory in Unpaced Production Lines, IIE Transactions, 29(1), 81-88. https://doi.org/10.1080/07408179708966314
- Gershwin, S. B. and Schor, J. E. (2000), Efficient Algorithms for Buffer Space Allocation, Analysis of Operational Research, 93(1-4), 117-144. https://doi.org/10.1023/A:1018988226612
- Ulgen, O., Gunal, A. Grajo, E., and Shore, J. (1994), The Role of Simulation in Design and Operation of Body and Paint Shops in Vehicle Assembly Plants, Proceedings of the European Simulation Symposium, 124-128.
- Xu, T., Moon, D. H., Shin, Y. W., and Jung, J. Y. (2010), An Effect Analysis of Layout Concepts on the Performances in Manufacturing Lines for Automotive Engine, Journal of the Korea Society for Simulation, 19(2), 107-118.
- Xu, T., Moon, D. H., and Baek, S. G. (2012), A Simulation Study Integrated with Analytic Hierarchy Process (AHP) in an Automotive Manufacturing System, Simulation, 88(4), 450-463. https://doi.org/10.1177/0037549711407781
Cited by
- A Simulation Study on Improving Throughput in a Crankshaft Line Considering Minimizing Investment Cost under Throughput Target vol.5, pp.1, 2017, https://doi.org/10.18178/ijmmm.2017.5.1.284