References
- N.K. Acharya, Y.D. Lee, H.M. Im, "Investigating delay factors in construction industry: a Korean perspective", Korean Journal of Construction Engineering and Management, Vol. 10, pp. 177-190, 2006.
- C. Ameyaw, S. Mensah, Y.D. Arthur, "Applicability of Bromilow's Time-Cost Model on Building Projects in Ghana", Proceedings of 4th West Africa Built Environment Research (WABER) Conference, Abuja, Nigeria, pp. 881-888, 24-26 July, 2012.
- F.J. Bromilow, "Contract time performance expectation and the reality", Building Forum, Vol. 1, No. 3, pp. 70-80, 1969.
- F.J. Bromilow, "Measurement and scheduling of construction time and cost performance in the construction industry", The Chartered Builder, Vol. 10, June-July, 1974.
- F.J. Bromilow, J.A. Henderson, "Procedures for reckoning and valuing the performance of building contracts", The Chartered Builder, Vol. 10, No. 9, p. 57, 1976.
- F.J. Bromilow, M.F. Hinds, N.F. Moody, "AIQS survey of building contract time performance", Building Economist, Vol. 19, No. 2, pp. 79-82, 1980.
- F.J. Bromilow, M.F. Hinds, N.F. Moody, "The Time and Cost Performance of Building Contracts 1976-1986", The Australian Institute of Quantity Surveyors, Sydney, 1988.
- A.P. Chan, "Modeling building durations in Hong Kong", Construction Management and Economics", Vol. 17, pp. 189-196, 1999. https://doi.org/10.1080/014461999371682
- A.P.C. Chan, "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, Vol. 19, pp. 223-229, 2001. https://doi.org/10.1016/S0263-7863(99)00072-1
- D.W.M. Chan, M.M. Kumaraswamy, "A study of the factors affecting construction durations in Hong Kong", Construction Management and Economics, Vol. 17, pp. 189-196, 1995.
- W.T. Chen, Y.H. Huang, "Approximately predicting the cost and duration of school reconstruction projects in Taiwan", Construction Management and Economics, Vol. 24, No. 12, pp. 1231-1239, 2006. https://doi.org/10.1080/01446190600953805
- I. Choudhury, M. Khan, A. Matin, "Relationship between Construction Time and Project Cost of Health Sector Construction Works in Bangladesh", ASC Proceedings of the 38th Annual Conference, Virginia Polytechnic Institute and State University, Blacksburg, Virginia, pp. 337-342, 11-13 April, 2002.
- C.P. Diana, R. Mladen, "Construction time-cost model in Croatia", Engineering Modeling 1-4, pp. 63-70, 2009.
- I.R. Endut, A. Akintoye, J. Kelly, "Relationship between duration and cost of Malaysian construction projects", Proceedings of the International Conference in the Built Environment in the 21st Century, Kuala Lumpur, pp. 299-309, June, 2006.
- J. Fortune, D. White, "Framing of project critical success factors by a system model", International Journal of Project Management, Vol. 24, pp. 53-65, 2006. https://doi.org/10.1016/j.ijproman.2005.07.004
- G.J. Hoffman, A.E. Thal, T.S. Webb, J.D. Weir, "Estimating performance time for construction projects", Journal of Management in Engineering (ASCE), Vol. 23, No. 4, pp. 193-199, 2007. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(193)
- V. Ireland, "The role of managerial actions in cost, time, and quality performance of high rise commercial building projects", PhD thesis, Univ. of Sydney, Sydney, Australia, 1983.
- A.P. Kaka, A.D.F. Price, "Relationship between value and duration of construction projects", Construction Management and Economics, Vol. 9, No. 4, pp. 383-400, 1991. https://doi.org/10.1080/01446199100000030
- R. Kenley, R. "The predictive ability of Bromilow's time-cost model: a comment", Construction Management and Economics, Vol. 19, No. 8, pp. 759-764, 2001. https://doi.org/10.1080/01446190110073490
- M.M. Kumaraswamy, D.W.M. Chan, "Determinants of construction duration", Construction Management & Economics, Vol. 13, No. 3, p. 209-217, 1995. https://doi.org/10.1080/01446199500000025
- L. Le-Hoai, Y.D. Lee, J.W. Cho, "Construction of time-cost model for building projects in Vietnam", Korean Journal of Construction Engineering and Management (KICEM), Vol. 10, No. 3, pp. 130-138, 2009.
- L. Le-Hoai, Y.D. Lee, "Time-cost model of building construction projects in Korea", Korean Journal of Construction Engineering and Management (KICEM), Emerald Group Publishing Limited, Vol. 27, No. 13/14, pp. 549-559, 2009.
- P.E.D. Love, R.Y.C Tse, D.J. Edwards, "Time-cost relationships in Australian building construction projects", Journal of Construction Engineering and Management (ASCE), Vol. 131, No. 2, pp. 187-194, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(187)
- S.T. Ng, M.M.Y. Mak, R.M. Skitmore, K.C. Lam, M. Varnam, "The predictive ability of Bromilow's time-cost model", Construction Management and Economics, Vol. 19, No. 2, pp. 165-173, 2001. https://doi.org/10.1080/01446190150505090
- D.R. Ogunsemi, G.O. Jagboro, "Time-cost for building projects in Nigeria", Construction Management and Economics, Vol. 24, No. 3, pp. 253-258, 2006. https://doi.org/10.1080/01446190500521041
- D. Onur, S. Christian, "Determinants of construction duration for building projects in Germany", Engineering, Construction and Architectural Management, Vol. 19, No. 4, pp. 444-468, 2012. https://doi.org/10.1108/09699981211237139
- MD. R.R Shaon, "Investigation of construction delay of real estate companies in Dhaka city", Bachelor of Science thesis, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh, 2012.
- A.C. Sidwell, "The time performance of construction projects", Architectural Science Review, Vol. 27, pp. 85-91, 1984. https://doi.org/10.1080/00038628.1984.9696557
- M. Skitmore, T. Ng, "Australian project-time analysis: Statistical analysis of intertemporal trends", Civ. Eng. Pract., 19(5), 455-458, 2001.
- D.H.T. Walker, "Construction time performance-Melbourne research findings", in Proceedings of ARCOM Conference 1994, Loughborough, UK, pp. 275- 284, September, 1994.
- D.H.T Walker, "An investigation into construction time performance", Construction Management and Economics, Vol. 13, No. 3, pp. 263-274, 1995. https://doi.org/10.1080/01446199500000030
- C.M. Yeong, "Time and cost performance of building contracts in Australia and Malaysia", MSc thesis, Univ. of South Australia, Adelaide, Australia, 1994.
- http://en.wikipedia.org/wiki/List_of_countries_by_GDP_(nominal) Financial report by International Monetary Fund, 2013.
Cited by
- Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea? vol.32, pp.1, 2016, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000394