DOI QR코드

DOI QR Code

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur (Interdisciplinary Program of Construction Engineering and Management, Pukyong National University) ;
  • Lee, Young Dai (Department of Civil Engineering, Pukyong National University) ;
  • Ha, Duy Khanh (Interdisciplinary Program of Construction Engineering and Management, Pukyong National University) ;
  • Chun, Yong Hyun (Department of Civil Engineering, Pukyong National University)
  • Published : 2014.09.01

Abstract

Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

Keywords

References

  1. N.K. Acharya, Y.D. Lee, H.M. Im, "Investigating delay factors in construction industry: a Korean perspective", Korean Journal of Construction Engineering and Management, Vol. 10, pp. 177-190, 2006.
  2. C. Ameyaw, S. Mensah, Y.D. Arthur, "Applicability of Bromilow's Time-Cost Model on Building Projects in Ghana", Proceedings of 4th West Africa Built Environment Research (WABER) Conference, Abuja, Nigeria, pp. 881-888, 24-26 July, 2012.
  3. F.J. Bromilow, "Contract time performance expectation and the reality", Building Forum, Vol. 1, No. 3, pp. 70-80, 1969.
  4. F.J. Bromilow, "Measurement and scheduling of construction time and cost performance in the construction industry", The Chartered Builder, Vol. 10, June-July, 1974.
  5. F.J. Bromilow, J.A. Henderson, "Procedures for reckoning and valuing the performance of building contracts", The Chartered Builder, Vol. 10, No. 9, p. 57, 1976.
  6. F.J. Bromilow, M.F. Hinds, N.F. Moody, "AIQS survey of building contract time performance", Building Economist, Vol. 19, No. 2, pp. 79-82, 1980.
  7. F.J. Bromilow, M.F. Hinds, N.F. Moody, "The Time and Cost Performance of Building Contracts 1976-1986", The Australian Institute of Quantity Surveyors, Sydney, 1988.
  8. A.P. Chan, "Modeling building durations in Hong Kong", Construction Management and Economics", Vol. 17, pp. 189-196, 1999. https://doi.org/10.1080/014461999371682
  9. A.P.C. Chan, "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, Vol. 19, pp. 223-229, 2001. https://doi.org/10.1016/S0263-7863(99)00072-1
  10. D.W.M. Chan, M.M. Kumaraswamy, "A study of the factors affecting construction durations in Hong Kong", Construction Management and Economics, Vol. 17, pp. 189-196, 1995.
  11. W.T. Chen, Y.H. Huang, "Approximately predicting the cost and duration of school reconstruction projects in Taiwan", Construction Management and Economics, Vol. 24, No. 12, pp. 1231-1239, 2006. https://doi.org/10.1080/01446190600953805
  12. I. Choudhury, M. Khan, A. Matin, "Relationship between Construction Time and Project Cost of Health Sector Construction Works in Bangladesh", ASC Proceedings of the 38th Annual Conference, Virginia Polytechnic Institute and State University, Blacksburg, Virginia, pp. 337-342, 11-13 April, 2002.
  13. C.P. Diana, R. Mladen, "Construction time-cost model in Croatia", Engineering Modeling 1-4, pp. 63-70, 2009.
  14. I.R. Endut, A. Akintoye, J. Kelly, "Relationship between duration and cost of Malaysian construction projects", Proceedings of the International Conference in the Built Environment in the 21st Century, Kuala Lumpur, pp. 299-309, June, 2006.
  15. J. Fortune, D. White, "Framing of project critical success factors by a system model", International Journal of Project Management, Vol. 24, pp. 53-65, 2006. https://doi.org/10.1016/j.ijproman.2005.07.004
  16. G.J. Hoffman, A.E. Thal, T.S. Webb, J.D. Weir, "Estimating performance time for construction projects", Journal of Management in Engineering (ASCE), Vol. 23, No. 4, pp. 193-199, 2007. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(193)
  17. V. Ireland, "The role of managerial actions in cost, time, and quality performance of high rise commercial building projects", PhD thesis, Univ. of Sydney, Sydney, Australia, 1983.
  18. A.P. Kaka, A.D.F. Price, "Relationship between value and duration of construction projects", Construction Management and Economics, Vol. 9, No. 4, pp. 383-400, 1991. https://doi.org/10.1080/01446199100000030
  19. R. Kenley, R. "The predictive ability of Bromilow's time-cost model: a comment", Construction Management and Economics, Vol. 19, No. 8, pp. 759-764, 2001. https://doi.org/10.1080/01446190110073490
  20. M.M. Kumaraswamy, D.W.M. Chan, "Determinants of construction duration", Construction Management & Economics, Vol. 13, No. 3, p. 209-217, 1995. https://doi.org/10.1080/01446199500000025
  21. L. Le-Hoai, Y.D. Lee, J.W. Cho, "Construction of time-cost model for building projects in Vietnam", Korean Journal of Construction Engineering and Management (KICEM), Vol. 10, No. 3, pp. 130-138, 2009.
  22. L. Le-Hoai, Y.D. Lee, "Time-cost model of building construction projects in Korea", Korean Journal of Construction Engineering and Management (KICEM), Emerald Group Publishing Limited, Vol. 27, No. 13/14, pp. 549-559, 2009.
  23. P.E.D. Love, R.Y.C Tse, D.J. Edwards, "Time-cost relationships in Australian building construction projects", Journal of Construction Engineering and Management (ASCE), Vol. 131, No. 2, pp. 187-194, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(187)
  24. S.T. Ng, M.M.Y. Mak, R.M. Skitmore, K.C. Lam, M. Varnam, "The predictive ability of Bromilow's time-cost model", Construction Management and Economics, Vol. 19, No. 2, pp. 165-173, 2001. https://doi.org/10.1080/01446190150505090
  25. D.R. Ogunsemi, G.O. Jagboro, "Time-cost for building projects in Nigeria", Construction Management and Economics, Vol. 24, No. 3, pp. 253-258, 2006. https://doi.org/10.1080/01446190500521041
  26. D. Onur, S. Christian, "Determinants of construction duration for building projects in Germany", Engineering, Construction and Architectural Management, Vol. 19, No. 4, pp. 444-468, 2012. https://doi.org/10.1108/09699981211237139
  27. MD. R.R Shaon, "Investigation of construction delay of real estate companies in Dhaka city", Bachelor of Science thesis, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh, 2012.
  28. A.C. Sidwell, "The time performance of construction projects", Architectural Science Review, Vol. 27, pp. 85-91, 1984. https://doi.org/10.1080/00038628.1984.9696557
  29. M. Skitmore, T. Ng, "Australian project-time analysis: Statistical analysis of intertemporal trends", Civ. Eng. Pract., 19(5), 455-458, 2001.
  30. D.H.T. Walker, "Construction time performance-Melbourne research findings", in Proceedings of ARCOM Conference 1994, Loughborough, UK, pp. 275- 284, September, 1994.
  31. D.H.T Walker, "An investigation into construction time performance", Construction Management and Economics, Vol. 13, No. 3, pp. 263-274, 1995. https://doi.org/10.1080/01446199500000030
  32. C.M. Yeong, "Time and cost performance of building contracts in Australia and Malaysia", MSc thesis, Univ. of South Australia, Adelaide, Australia, 1994.
  33. http://en.wikipedia.org/wiki/List_of_countries_by_GDP_(nominal) Financial report by International Monetary Fund, 2013.

Cited by

  1. Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea? vol.32, pp.1, 2016, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000394