DOI QR코드

DOI QR Code

Bayesian Reliability Estimation of a New Expendable Launch Vehicle

신규 개발하는 소모성 발사체의 베이지안 신뢰도 추정

  • Hong, Hyejin (Department of Industrial Engineering, Konkuk University) ;
  • Kim, Kyungmee O. (Department of Industrial Engineering, Konkuk University)
  • Received : 2014.04.15
  • Accepted : 2014.04.28
  • Published : 2014.06.30

Abstract

Purpose: This paper explains how to obtain the Bayes estimates of the whole launch vehicle and of a vehicle stage, respectively, for a newly developed expendable launch vehicle. Methods: We determine the parameters of the beta prior distribution using the upper bound of the 60% Clopper-Pearson confidence interval of failure probability which is calculated from previous launch data considering the experience of the developer. Results: Probability that a launch vehicle developed from an inexperienced developer succeeds in the first launch is obtained by about one third, which is much smaller than that estimated from the previous research. Conclusion: The proposed approach provides a more conservative estimate than the previous noninformative prior, which is more reasonable especially for the initial reliability of a new vehicle which is developed by an inexperienced developer.

Keywords

References

  1. Chang, I-Shih. 2000. "Overview of World Space Launches." Journal of Propulsion and Power 16:853-866. https://doi.org/10.2514/2.5651
  2. Clopper, C. J., and Pearson, Egon Sharpe. 1934. "The Use of Confidence or Fiducial Limits Illustrated in the Case of the Binomial." Biometrika 26:404-413. https://doi.org/10.1093/biomet/26.4.404
  3. Federal Aviation Administration. 2005. Guide to Probability of Failure Analysis for New Expendable Launch Vehicles. Washington, D.C.: Commercial Space Transportation.
  4. Guikema, Seth D., and Pate-Cornell, M. Elisabeth. 2004. "Bayesian Analysis of Launch Vehicle Success Rates." Journal of Spacecraft and Rockets 41:93-102. https://doi.org/10.2514/1.9268
  5. Hamada, Michael S., Wilson, Alyson, Reese, Shane, and Martz, Harry. 2008. Bayesian Reliability. New York: Springer.
  6. Han, Poonggyoo, Kim, Kyoungho, Woo, Yoocheol, Cho, Sangyeon, and Kim, Yongwook. 2003. "Launch Vehicle Reliability Analysis." Proceeding of the Korean Society of the Propulsion Engineers:76-79.
  7. Jung, Inha, and Lee, Seungho. 1991. "Empirical Bayes Estimation of Binomial Parameter with an Application to the Lot Acceptance Sampling Problem." Journal of the Korean Society for Quality Management 19:86-95.
  8. Johnson, Valen E., Moosman, Ann, and Cotter, Paul. 2005. "A Hierarchical Model for Estimating the Early Reliability of Complex Systems." IEEE Transactions on Reliability 54:224-321. https://doi.org/10.1109/TR.2005.847262
  9. Kim, Gwang-sub, and English, John R. 1991. "On the Development of Quality Assurance System: Achieving Reliability in Purchased Equipment." Journal of the Korean Society for Quality Management 19(1):43-50.
  10. Kim, Woo-chul, and Kim, Sung-ho. 1982. "A Study on Optimal Sampling Accpetance Plans with Respect to a Linear Loss Function and a Beta-Binomial Distribution." Journal of the Korean Society for Quality Management 10:25-33.
  11. Leemis, Lawrence M, and Trivedi, Kishor S. 1996. "A Comparison of Approximate Interval Estimators for the Bernoulli Parameter." The American Statistician 50:63-68.
  12. Seo, Yoonkyung, Lee, Joonho, Yoo, Ilsang, and Oh, Bumseok. 2005 "Case Study on Russian Launch Vehicle Failures." Proceedings of KSAS Symposium on Aerospace Engineering 11:317-320.
  13. Springer, Michael D., and Thompson, William E. 1966. "Bayesian Confidence Limits for the Product of N Binomial Parameters." Biometrika 53:611-613. https://doi.org/10.1093/biomet/53.3-4.611
  14. Yoo, Seung-Woo, Park, Keun-Young, Lee, Kyung-Chul, and Lee, Sang-Jun. 2004. "A Study on the Reliability of Space Launch Vehicle." Journal of Applied Reliability 4:105-119.