DOI QR코드

DOI QR Code

A study on the evaluation of policy elements for a solution of long-term unexecuted urban parks

장기 미집행 도시공원 해소를 위한 정책구성요인 평가 연구

  • Hong, Ji Wook (Department of Urban Engineering, Pusan National University) ;
  • Shim, Jae Heon (Institute of Environmental Studies, Pusan National University) ;
  • Lee, Sung-Ho (Department of Urban Engineering, Pusan National University)
  • 홍지욱 (부산대학교 도시공학과) ;
  • 심재헌 (부산대학교 환경연구원) ;
  • 이성호 (부산대학교 도시공학과)
  • Received : 2014.04.21
  • Accepted : 2014.06.12
  • Published : 2014.06.30

Abstract

This paper provides a solution for long-term unexecuted urban parks and its implication by evaluating the policy elements using an analytic hierarchy process approach. The policy elements evaluation was carried out for a group of experts related to long-term unexecuted urban planning facilities or parks. The evaluation process consisted of the following three steps: the selection of policy elements, the weights assessment, and an analysis of the evaluation results. The empirical findings show that experts place a high value on policy elements, such as government subsidies (0.183), the linkage between a municipal fiscal plan and an executive plan (0.165), a reconsideration of the current long-term unexecuted urban parks (0.154), and a grant or long-term lease of state-owned land (0.110). A wide range of in-depth discussion is strongly needed ahead of the sunset regulation on urban parks, which will take effect in 2015.

본 연구는 장기 미집행 도시공원 해소를 위한 정책구성요인을 평가함으로써 향후 정책수행을 위한 시사점을 제시하는데 그 목적이 있다. 본 연구의 정책요인 평가는 장기 미집행 도시 군계획시설 혹은 도시공원과 관련된 업무를 담당하는 전문가 집단을 대상으로 시행되었으며, 그 절차는 정책요인의 선정, 정책요인 간 가중치 산정, 평가결과의 해석이라는 세단계로 구성되었다. 평가의 결과, 전문가들은 정책요인 중 국고보조금 확보(0.183), 지방재정계획과 단계별 집행계획의 연계(0.165), 장기 미집행 도시공원의 선별적 존치(0.154), 국유지 무상 양여 및 장기 임대(0.110)와 같은 요인을 상대적으로 중요하게 평가하였다. 향후 도시공원 일몰제의 시행에 앞서 장기 미집행 도시공원 해소를 위한 폭넓고 심도 있는 논의가 이루어질 필요성이 제기된다.

Keywords

References

  1. Ministry of Land, Infrastructure and Transport, "Status Report of Urban Planning Affairs 2012", 2013
  2. Y.H. Jeong and Y.J. Lee, "A Study on the stablishment of a Quantitative Criteria for the Review of Unexecuted Urban Planning Facilities in Long-term", Journal of Korea Planners Association, Vol.38, No.1, pp.37-51, 2003
  3. C.W. Nam, "A Study on the Role of Local Governments for Resolving Long-Term Unexecuted Urban Facilities", Korean Journal of Local Finance, Vol.9, No.1, pp.143-162, 2004
  4. S.H. Choi, "A Management Proposal of Long-term Non-Executed Urban Planning Facilities", Kyungpook National University, 2006
  5. Y.L. Lim and G.Y. Kim, "The study on a solution to urban planning facilities unexecuted in long-term by utilizing private capital -Focusing on cases-", Journal of the Korean Regional Development Association, Vol.19, No.1, pp.121-144, 2007
  6. J.J. Lee, S.C. Park and H. Kim, "A Study on the Effective Plans to Increase Urban Parks through Activating Private Participation -Focusing on the Plans to Improve Park Facilities at the Balance Point of Public and Private Interest-", The Geographical Journal of Korea, Vol.43, No.4, pp.675-684, 2009
  7. S.Y. Kim and C.S. Lee, "A Study on Applied Simulation for the Acquisition System of the Urban Parks Unexecuted in Long-term under the Special Use Permit", Journal of Korea Planners Association, Vol.45, No.5, pp.65-79, 2010
  8. N.J. Jang and J. Kim, "A Simulation to Estimate the Applicability of Special Use Permit Policy to Seoul Park System", Journal of Korea Planners Association, Vol.48, No.4, pp.169-186, 2013
  9. T.L. .Saaty, "The Analytic Hierarchy Process", McGraw-Hill, 1981.