References
- AITES-ITA Working Group No. 14 (2000), Recommendations and Guidelines for Tunnel Boring Machines (TBMs), International Tunnelling and Underground Space Association, pp. 1-118.
- Bieniawski, Z.T., Celada, B., Galera, J.M., Tardaguila, I. (2008), "New applications of the excavability index for selection of TBM types and predicting their performance", World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety, pp. 1618-1629.
- Bryson, N. (1999), "Generating consensus priority point vectors: A logarithmic goal programming", Computers & Operations Research, Vol. 26, pp. 637-643. https://doi.org/10.1016/S0305-0548(98)00083-5
- Edalat, K., Vahdatirad M.J., Ghodrat, H., Firouzian, S., Barari, A. (2010), "Choosing TBM for tabriz subway using multi criteria method", Journal of civil engineering and management, Vol. 16, No. 4, pp. 531-539. https://doi.org/10.3846/jcem.2010.59
- German Tunnelling Committee Working Group (2000), Recommendations for selecting and evaluating tunnel boring machines, tunnel 5/97, Deutscher Ausschuss fur unterirdisches Bauen, pp 20-35.
- Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J., Bejari, H. (2010), "Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP", Bulletin of Engineering Geology and the Environment, Vol. 69, No. 4, pp. 523-532. https://doi.org/10.1007/s10064-009-0260-8
- Kim, M.G., Lee, Y.S. (2008), "A suggestion of a new rock mass classification system", Journal of the Korean Geotechnical society, Vol. 24, No. 11, pp. 43-53.
- Korea Express Corporation (1996), road design guideline, Vol. 2, part 5, pp. 41-42.
- Maidl, B, Herrenknecht, M, Maidl, U., Wehrmeyer, G. (2012), Mechanised Shield Tunnelling 2nd Edition, Ernst & Sohn, Germany, pp. 262-264, pp. 400-447.
- Mikhailov, L. (2004), "Group prioritization in the AHP by fuzzy preference programming method", Computers & Operations Research, Vol. 31, pp. 293-301. https://doi.org/10.1016/S0305-0548(03)00012-1
- Ramanathan, R., Ganesh, L.S. (1994), "Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members weightages", European Journal of Operational Research, Vol. 79, pp. 249-265. https://doi.org/10.1016/0377-2217(94)90356-5
- Saaty, T.L. (1977), "A scaling method for priorities in hierarchy structures", Journal of Mathematical Psychology, Vol. 15, No. 3, pp. 234-281. https://doi.org/10.1016/0022-2496(77)90033-5
- Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.
- Shahriar, K., Sharifzadeh, M., Hamidi, J.K., (2008), "Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions", Tunnelling and Underground Space Technology, Vol. 23, pp. 318-325. https://doi.org/10.1016/j.tust.2007.06.012
- Taheri, A., Borujeni, H.A.M. (2008), "Tunnelling machine selection for tunnel excavation in rock, using AHP method: CASE STUDY: Line 1 of the esfahan metro project", International Conference and Exhibition on Tunnelling, International Tunnelling and Underground Space Association.
- Yazdani-Chamzini, A., Yakhchali, S.H. (2012), "TBM selection using fuzzy multicriteria decision making methods", Tunnelling and Underground Space Technology, Vol. 30, pp. 194-204. https://doi.org/10.1016/j.tust.2012.02.021