참고문헌
- Park, C. S., Lee, D. Y., Kwon, O. S. and Wang, X., (2013). "A Framework for Proactive Construction Defect Management Using BIM, Augmented Reality and Ontoloy-based Data Collection Template", Automation in Construction, Vol.33, pp. 61-71. https://doi.org/10.1016/j.autcon.2012.09.010
- Lertlakkhanakul, J. and Han, S. Y., (2012). "Construction Management System Using the Mobile Augmented Reality Techniques." Journal of the Architectural Institute of Korea, 22(2), pp. 139-145.
- Choi, B. I., Chung, K. Y., Park, C. D. and Han, Y. S., (2012). Journal of Korean Society of Civil Engineers, 55(11), pp. 32-36.
- Jeon, S. M., and Kim, K. S., (2012). "Design and Implementation of Piping Spool Management Android Application using QR Code", Journal of Digital Contents Society, 13(4), pp. 609-616. https://doi.org/10.9728/dcs.2012.13.4.609
- Park, S. H., Kwon, S. W. and Kim, Y. S., (2012) "Elicitation of Potential Information Technology for Construction Process and Tasks", Korean journal of construction engineering and management, KICEM, 13(1), pp. 160-169. https://doi.org/10.6106/KJCEM.2012.13.1.160
- Lim, J. S., (2012). " Improvement for Individual Work Order Process in Manufacturing Piping Spool of O(ffshore Facilities", A Master's thesis, Ulsan university.
- Kim, C. H., (2011). " Development of automated pipe spool installation management process based on mobile augmented reality for plant construction", A Master's thesis, Sungkyunkwan university.
- Kim. Y. W. and Moon. I. Y., (2011). "A Study of Trend Technology and Application Case Using NFC", The 34th Conference of KIICE(Journal of Korea Institute of Information and Communication Engineering) 2013.
- Shin, D. H. and Dunston, P. (2010). "Technology development needs for advancing Augmented Reality-based inspection", Automation in Construction, 19(2), pp. 169-182. https://doi.org/10.1016/j.autcon.2009.11.001
- Song, Y. W., Cho, H. M. and Choi, Y. K., (2009). "Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis", Korean journal of construction engineering and management, KICEM, 10(5), pp. 3-15.
- Won, S. K., Lee, J. B. and Han, C. H. (2009). "Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects", Journal of the Korea Institute of building construction, 9(6), pp. 151-159. https://doi.org/10.5345/JKIC.2009.9.6.151
- Jung, Y. G. (2008). " Application to Pre-fabricated Piping in a Chemical Plant for the Construction Ability", A Master's thesis, Hanyang university.
- Shin, D. H. and Dunston, P. (2008). "Identification of application areas for Augmented Reality in industrial construction based on technology suitability", Automation in Construction, 17(7), pp. 882-894. https://doi.org/10.1016/j.autcon.2008.02.012
- Kang, I. S., (2002). "Improving 4D Modeling System through a Comparative Analysis of 4D Functions for Construction Management", Journal of the Architectural Institute of Korea, 18(10), pp. 85-92.
- Arbulu, Roberto J. and Tommelein, Iris D. (2002). "value Stream Analysis of Construction Supply Chain : Case Study on Pipe Supports used in Power Plants" 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil.