References
- IAEA, "The Great East Japan Earthquake Expert Mission, IAEA International Fact Finding Expert Mission of the Fukushima Dai-Ichi NPP Accident Following The Great East Japan Earthquake and Tsunami," 24 May-2 June 2011
- INPO, "Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station Revision," INPO 11-005, November 2011
- American Nuclear Society, "Fukushima Daiichi: ANS Report," March 2012
- EPRI, "Fukushima Dai-Ichi Accident - Technical Casual Factor Analysis," March, 2012
- Japan Nuclear Technology Institute, "Review of Accident at Tokyo Electric Power Company Incorporated's Fukushima Daiichi Nuclear Power Station and Proposed Countermeasures," October 2011
- The Fukushima Nuclear Accident Independent Investigation Commission, "The National Diet of Japan, The official report of The Fukushima Nuclear Accident Independent Investigation Commission," 2012
- Investigation Committee on the Accidents at Fukushima Nuclear Power Stations of Tokyo Electric Power Company, Interim Report, December 2011
- US NRC, "The Near Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Recommendations for Enhancing Reactor Safety in the 21st Century," USNRC, July 2011
- OECD/NEA, "Fukushima Dai-Ichi Nuclear Power Station Accident: Summary of NEA and Member Response," June 2013
- Committee on the Fukushima Accident of Korean Nuclear Society, "Korean Nuclear Society Report on Fukushima Accident: Characteristics, Consequences, Causes and Lessons," March 2013
- TEPCO, "Fukushima Accident Analysis Report," June 2012
- IAEA, "Defence in Depth in Nuclear Safety," INSAG-10, 1996
- IAEA, "Proposal for a Technology-Neutral Safety Approach for New Reactor Designs," IAEA-TECDOC-1570, September 2007
- Mamdouh El-Shanawany, IAEA SAFETY STANDARDS FOR SAFETY ASSESSMENT, http://www-ns.iaea.org/downloads/ni/training/safety_standards_presentations/IAEA%20Safety%20Standards%20for%20Safety%20Assessment.pdf, May 2010
- TEPCO, "Evaluation of the situation of cores and containment vessels of Fukushima Daiichi Nuclear Power Station Units- 1 to 3 and examination into unsolved issues in the accident progression: Progress Report No. 1," December 2013
- Japan Society of Civil Engineers, "Tsunami Assessment Method for Nuclear Power Plants in Japan," 2002
- Hiroyuki Kameda, "Fragility Enhancement of SSC for Seismic-Tsunami Risk Reduction of NPP: Lessons from 11 March 2011," IAEA ISSC-EBP WA5 The First Meeting of WG5-1 and WG5-2, Sendai, 28-30 November 2011
- Toshiaki SAKAI et al, "Development of a Probabilistic Tsunami Hazard Analysis in Japan," ICONE 14, Florida, USA, July 2006
- US NRC, "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants, NUREG-1150," 1990
- EPRI, "Severe Accident Management Guidance Technical Basis Report, Volume 1: Candidate High-Level Actions and Their Effects," 2012
- Tokyo Electric Power Company, "Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (133rd Release)," Press Release 2014 Jan. 15, 2014
- H.W.Lewis et al, "Risk Assessment Review Group Report to the USNRC," NUREG/CR-0400, 1978
- IAEA, "Safety of Nuclear Power Plants: Design," IAEA Safety Standard, Specific Safety Requirements, No. SSR-2/1, 2012
- IAEA, "Deterministic Safety Analysis for Nuclear Power," Safety Standards Specific Safety Guide No. SSG-2, 2009
- Haapanen Pentti, Helminen Atte, "Failure Mode and Effects Analysis of Software-based Automation System," STUKYTO- TR 190, August 2002
- Mitsubishi Heavy Industries, Ltd.," US-APWR Technical Report: FMEA of Control Rod Drive Mechanism Control System," MUAP-07015(R0), December 2007
- NEI, "B.5.b Phase 2&3 Submittal Guideline," NEI 06-12, December 2006
- NEI, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," NEI 12-06, May 2012.
- US NRC, "Regulatory Guide 1.174; An Approach for Using Probabilistic Risk Assessment in Risk-informed Decisions on Plant Specific Changes to the Licensing Basis," Rev.2, 2011
- Tunc Aldemir, "Dynamic PRA/PSA - Ahistorical Perspective," Dynamic PRA/PSA Workshop, Ohio, USA, 2007
- Hyun Gook KANG & Seung-Cheol JANG, "Plant Risk Effect Analysis Focusing on Digital I&C Equipment Failures," Journal of Nuclear Science and Technology, 44:4, 590-596, 2007 https://doi.org/10.1080/18811248.2007.9711847
- David H. Johnson, "Risk Perception - A Risk Practitioner's View'" PSAM Topical Conference in Tokyo, 2013
- Woody Epstein, "A Probabilistic Risk Assessment Practioner looks at the Great East Japan Earthquake and Tsunami," A Ninokata Laboratory White Paper, 2011
- IAEA, "Basic Safety Principles for Nuclear Power Plants 75-INSAG-3 Rev. 1," INSAG-12, 1999
- Kim, Min Kyu, Choi, In-Kil, "A tsunami PSA methodology and application for NPP site in Korea," Nuclear Engineering and Design, 244, 2012
- US NRC, "Plan for the Development of a Methodology for Seismically Induced Fires and Floods," ML121450226, 2012
- Jung, Woo Sik, Yang, Joon-Eon, Ha, Jaejoo, "A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants," Reliability Engineering and System Safety vol. 82 issue 2 November, 2003. p. 165-172 https://doi.org/10.1016/S0951-8320(03)00140-6
- Karl N. Fleming, "Application of Probabilistic Risk Assessment to Multi-Unit Site," National Academy of Sciences Fukushima Committee, June 24, 2013
- Yang, Joon-Eon, "Development of an integrated risk assessment framework for internal/external events and all power modes," Nuclear Engineering and Technology, 44(5), 2012 https://doi.org/10.5516/NET.03.2012.706
- US NRC, "Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants," NUREG-1738, Division of Systems Safety and Analysis. Washington, D.C., January, 2001
- E.D. Throm, "Regulatory Analysis for the Resolution of Generic Issue 82: Beyond Design Basis Accidents in Spent Fuel Pools," NUREG-1353, US NRC, April 1989
- US NRC, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," Reg. Guide 1.219, November 2011
- Karl N Fleming, Fred A Silady, "A risk informed defensein- depth framework for existing and advanced reactors," Reliability Engineering & System Safety Volume 78, Issue 3, December 2002
Cited by
- Insights on Accident Information and System Operations during Fukushima Events vol.2014, pp.1687-6083, 2014, https://doi.org/10.1155/2014/123240
- Development of AN On-site, Rapid, Environmental Radiation-distribution Monitoring System for Decision Making during a Radiation Emergency vol.115, pp.4, 2018, https://doi.org/10.1097/HP.0000000000000898
- Challenging issues and recent R&D activities for enhancing nuclear safety in Korea vol.83, pp.3, 2018, https://doi.org/10.3139/124.110866