The Fukushima Dai-Ichi accident in 2011 has affected various aspects of the nuclear society worldwide. The accident revealed some problems in the conventional approaches used to ensure the safety of nuclear installations. To prevent such disastrous accidents in the future, we have to learn from them and improve the conventional approaches in a more systematic manner. In this paper, we will cover three issues. The first is to identify the key issues that affected the progress of the Fukushima Dai-Ichi accident greatly. We examine the accident from a defense-in-depth point of view to identify such issues. The second is to develop a more systematic approach to enhance the safety of nuclear installations. We reexamine nuclear safety from a risk point of view. We use the concepts of residual and unknown risks in classifying the risk space. All possible accident scenarios types are reviewed to clarify the characteristics of the identified issues. An approach is proposed to improve our conventional approaches used to ensure nuclear safety including the design of safety features and the safety assessments from a risk point of view. Finally, we address some issues to be improved in the conventional risk assessment and management framework and/or practices to enhance nuclear safety.

Keywords

References

  1. IAEA, "The Great East Japan Earthquake Expert Mission, IAEA International Fact Finding Expert Mission of the Fukushima Dai-Ichi NPP Accident Following The Great East Japan Earthquake and Tsunami," 24 May-2 June 2011
  2. INPO, "Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station Revision," INPO 11-005, November 2011
  3. American Nuclear Society, "Fukushima Daiichi: ANS Report," March 2012
  4. EPRI, "Fukushima Dai-Ichi Accident - Technical Casual Factor Analysis," March, 2012
  5. Japan Nuclear Technology Institute, "Review of Accident at Tokyo Electric Power Company Incorporated's Fukushima Daiichi Nuclear Power Station and Proposed Countermeasures," October 2011
  6. The Fukushima Nuclear Accident Independent Investigation Commission, "The National Diet of Japan, The official report of The Fukushima Nuclear Accident Independent Investigation Commission," 2012
  7. Investigation Committee on the Accidents at Fukushima Nuclear Power Stations of Tokyo Electric Power Company, Interim Report, December 2011
  8. US NRC, "The Near Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, Recommendations for Enhancing Reactor Safety in the 21st Century," USNRC, July 2011
  9. OECD/NEA, "Fukushima Dai-Ichi Nuclear Power Station Accident: Summary of NEA and Member Response," June 2013
  10. Committee on the Fukushima Accident of Korean Nuclear Society, "Korean Nuclear Society Report on Fukushima Accident: Characteristics, Consequences, Causes and Lessons," March 2013
  11. TEPCO, "Fukushima Accident Analysis Report," June 2012
  12. IAEA, "Defence in Depth in Nuclear Safety," INSAG-10, 1996
  13. IAEA, "Proposal for a Technology-Neutral Safety Approach for New Reactor Designs," IAEA-TECDOC-1570, September 2007
  14. Mamdouh El-Shanawany, IAEA SAFETY STANDARDS FOR SAFETY ASSESSMENT, http://www-ns.iaea.org/downloads/ni/training/safety_standards_presentations/IAEA%20Safety%20Standards%20for%20Safety%20Assessment.pdf, May 2010
  15. TEPCO, "Evaluation of the situation of cores and containment vessels of Fukushima Daiichi Nuclear Power Station Units- 1 to 3 and examination into unsolved issues in the accident progression: Progress Report No. 1," December 2013
  16. Japan Society of Civil Engineers, "Tsunami Assessment Method for Nuclear Power Plants in Japan," 2002
  17. Hiroyuki Kameda, "Fragility Enhancement of SSC for Seismic-Tsunami Risk Reduction of NPP: Lessons from 11 March 2011," IAEA ISSC-EBP WA5 The First Meeting of WG5-1 and WG5-2, Sendai, 28-30 November 2011
  18. Toshiaki SAKAI et al, "Development of a Probabilistic Tsunami Hazard Analysis in Japan," ICONE 14, Florida, USA, July 2006
  19. US NRC, "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants, NUREG-1150," 1990
  20. EPRI, "Severe Accident Management Guidance Technical Basis Report, Volume 1: Candidate High-Level Actions and Their Effects," 2012
  21. Tokyo Electric Power Company, "Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (133rd Release)," Press Release 2014 Jan. 15, 2014
  22. H.W.Lewis et al, "Risk Assessment Review Group Report to the USNRC," NUREG/CR-0400, 1978
  23. IAEA, "Safety of Nuclear Power Plants: Design," IAEA Safety Standard, Specific Safety Requirements, No. SSR-2/1, 2012
  24. IAEA, "Deterministic Safety Analysis for Nuclear Power," Safety Standards Specific Safety Guide No. SSG-2, 2009
  25. Haapanen Pentti, Helminen Atte, "Failure Mode and Effects Analysis of Software-based Automation System," STUKYTO- TR 190, August 2002
  26. Mitsubishi Heavy Industries, Ltd.," US-APWR Technical Report: FMEA of Control Rod Drive Mechanism Control System," MUAP-07015(R0), December 2007
  27. NEI, "B.5.b Phase 2&3 Submittal Guideline," NEI 06-12, December 2006
  28. NEI, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," NEI 12-06, May 2012.
  29. US NRC, "Regulatory Guide 1.174; An Approach for Using Probabilistic Risk Assessment in Risk-informed Decisions on Plant Specific Changes to the Licensing Basis," Rev.2, 2011
  30. Tunc Aldemir, "Dynamic PRA/PSA - Ahistorical Perspective," Dynamic PRA/PSA Workshop, Ohio, USA, 2007
  31. Hyun Gook KANG & Seung-Cheol JANG, "Plant Risk Effect Analysis Focusing on Digital I&C Equipment Failures," Journal of Nuclear Science and Technology, 44:4, 590-596, 2007 https://doi.org/10.1080/18811248.2007.9711847
  32. David H. Johnson, "Risk Perception - A Risk Practitioner's View'" PSAM Topical Conference in Tokyo, 2013
  33. Woody Epstein, "A Probabilistic Risk Assessment Practioner looks at the Great East Japan Earthquake and Tsunami," A Ninokata Laboratory White Paper, 2011
  34. IAEA, "Basic Safety Principles for Nuclear Power Plants 75-INSAG-3 Rev. 1," INSAG-12, 1999
  35. Kim, Min Kyu, Choi, In-Kil, "A tsunami PSA methodology and application for NPP site in Korea," Nuclear Engineering and Design, 244, 2012
  36. US NRC, "Plan for the Development of a Methodology for Seismically Induced Fires and Floods," ML121450226, 2012
  37. Jung, Woo Sik, Yang, Joon-Eon, Ha, Jaejoo, "A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants," Reliability Engineering and System Safety vol. 82 issue 2 November, 2003. p. 165-172 https://doi.org/10.1016/S0951-8320(03)00140-6
  38. Karl N. Fleming, "Application of Probabilistic Risk Assessment to Multi-Unit Site," National Academy of Sciences Fukushima Committee, June 24, 2013
  39. Yang, Joon-Eon, "Development of an integrated risk assessment framework for internal/external events and all power modes," Nuclear Engineering and Technology, 44(5), 2012 https://doi.org/10.5516/NET.03.2012.706
  40. US NRC, "Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants," NUREG-1738, Division of Systems Safety and Analysis. Washington, D.C., January, 2001
  41. E.D. Throm, "Regulatory Analysis for the Resolution of Generic Issue 82: Beyond Design Basis Accidents in Spent Fuel Pools," NUREG-1353, US NRC, April 1989
  42. US NRC, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," Reg. Guide 1.219, November 2011
  43. Karl N Fleming, Fred A Silady, "A risk informed defensein- depth framework for existing and advanced reactors," Reliability Engineering & System Safety Volume 78, Issue 3, December 2002

Cited by

  1. Insights on Accident Information and System Operations during Fukushima Events vol.2014, pp.1687-6083, 2014, https://doi.org/10.1155/2014/123240
  2. Development of AN On-site, Rapid, Environmental Radiation-distribution Monitoring System for Decision Making during a Radiation Emergency vol.115, pp.4, 2018, https://doi.org/10.1097/HP.0000000000000898
  3. Challenging issues and recent R&D activities for enhancing nuclear safety in Korea vol.83, pp.3, 2018, https://doi.org/10.3139/124.110866