References
- AB&S, Introduction to Time Prism, www.timeprism. co.kr, 2014.
- ALB-Research Group, http://www.assembly-line- balancing. de, 2014.
- Atworth Co. Ltd., VITAMAX Users' Manual, Seoul : Atworth Co. Ltd., 2010.
- Becker, C. and Scholl, A., A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 2006, Vol. 168, p 694-715. https://doi.org/10.1016/j.ejor.2004.07.023
- Becker, C. and Scholl, A., State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 2006, Vol. 168, p 666-693. https://doi.org/10.1016/j.ejor.2004.07.022
- Choi, S.H. and Mo, C.W., A Visual Motion and Time Study Software, VITAMAX. Journal of the Society of Korea Industrial and Systems Engineering, 2010, Vol. 33, No. 2, p 33-38.
- Gurevsky, E., Battaia, O., and Dolgui, A., Stability measure for a generalized assembly line balancing problem. Discrete Applied Mathematics, 2013, Vol. 161, p 37-394.
- Hwang, H., Work Study (2nd ed), Seoul : Youngchi Publishers, 2005.
- IBM, Digital Process Plan Solution, PLM Solution Roadshow, 2009.
- JIET, http://www.jiet.co.jp, 2014.
- Scholl, A. and Klein, R., SALOME : A bidirectional branch and bound procedure for assembly line balancing. INFORMS Journal on Computing, 1997, Vol. 9, p 319-334. https://doi.org/10.1287/ijoc.9.4.319
- Song, W.S. and Kim, Y.G., Two-Sided Assembly Line Balancing with Preemptive Multiple Goals Using an Evolutionary Algorithm. Korean Management Science Review, 2009, Vol. 34, No. 2, p 101-111.
- Topaloglu, S., Salum, L., and Supciller, A.A., Rulebased modeling and constraint programming based solution of the assembly line balancing problem. Expert Systems with Applications, 2012, Vol. 39, p 3484-3493. https://doi.org/10.1016/j.eswa.2011.09.038
- Whitehouse, G.E., IIE Microsoftware : Production Control (IBM PC), Atlanta, GA : Institute of Industrial Engineers, 1983.