참고문헌
- Kim, H. H. (2009). "A Process Model for Effective Idea Creation and Administration of Value Engineering at Design Phase Activity", Master's Thesis of Department of Architecture Graduate School of Namseoul Univ.
- Kim, S. B., Choi, J. W. (2004). "Assessment of Design Phase VE Process and Its Impacts", The KSCE Journal of Civil Engineering, 24(5), pp. 749-757.
- Kwon, B. S. (2001). "A Study on Improvement of Subjec Selection Method for Value Engineering Process on Early Design Stage", Master's Thesis of Department of Architectural Engineering Graduate School of Dan-Kook Univ.
- Kwon, T. S. (2004). "A Study on the Methodology to Select Optimum Choice for Construction Value Engineering", Ph. D. Dissertation of Department of Architectural Engineering Graduate School of Yonsei Univ.
- Lee, J. H., Park, C. S. (2005). "The Conceptual Model of Web-Based Information System for Value Engineering (WISE) in Construction Project", Korean Journal of Construction Engineering and Management, KICEM, 6(3), pp. 167-177.
- Lee, S. H., Koo, K. J., Hyun, C. T. (2007). "Development of Case Based Value Engineering Support Tool", SAVE International 47th Anal Conference Proceedings, SAVE.
- Lin, G., Shen, G. Q., Sun, M., Kelly, J. (2011), "Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction", Journal of Construction Engineering and Management, ASCE, 137(9), pp. 698-706. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000348
- Mao, X., Zhang, X., AbouRizk, S. M. (2009). "Enhancing Value Engineering Process by Incorporating Inventive Problem-Solving Techniques", Journal of Construction Engineering and Management, ASCE, 135(5), pp. 416-424. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000001
- Minchin Jr., E. R., Henriquez, N. R., King, A. M, Lewis, D. W. (2010). "Owners Respond: Preferences for Task Performance, Delivery Systems, and Quality Management", Journal of Construction Engineering and Management, ASCE, 136(3), pp. 283-293. https://doi.org/10.1061/(ASCE)0733-9364(2010)136:3(283)
- Minchin Jr., R. E. (2009). "Fall and Rise of the Largest Construction Manager-at-Risk Transportation Construction Project Ever", Journal of Construction Engineering and Management, ASCE, 135(9), pp. 930-938. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000059
- Moon, S. W., HA, C. D., Yang. J. K. (2011). "Structured Idea Creation for Improving the Value of Construction Design", Journal of Construction Engineering and Management, ASCE, 138(7), pp. 841-853.
- Park, I. W. (2008). "Development of Customer Satisfaction VE Process during Design Phase using Axiomatic Design Theory", Master's Thesis of Graduate School of The University of Seoul.
- Park, C. S., Lee. J. U., Choi, S. I. (2002). "Comprehensive Apparaisal of Value Engineering Practices in Domestic Construction Industry", Korean Journal of Construction Engineering and Management, KICEM, 3(2), pp. 67-74.
- Sadi A., Osama A. J., Al-Tamimi A. (2000), "Computerized System for Application of Value Engineering Methodology", Journal of Computing in Civil Engineering, ASCE, 14(3), pp. 206-214. https://doi.org/10.1061/(ASCE)0887-3801(2000)14:3(206)
- Seo, Y. C., Woo, Y. M., Lee, S. H. (2010). "A Study on Developing the Actual cases Database of Value Engineering on Building Construction", The Korea Institute of Building Construction, 10(2), pp. 67-73. https://doi.org/10.5345/JKIC.2010.10.2.067
- Shen, Q., Liu, G. (2003). "Critical Success Factors for Value Management Studies in Construction", Journal of Construction Engineering and Management, ASCE, 129(5), pp. 485-491. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(485)
- Townsend, K., Lingard, H., Bradley, L., Brown, K. (2012). "Complicated Working Time Arrangements: Construction Industry Case Study", Journal of Construction Engineering and Management, ASCE, 138(3), pp. 443-448. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000436
- Yu, W., Wang, K. W. (2012). "Best Value or Lowest Bid? A Quantitative Perspective", Journal of Construction Engineering and Management, ASCE, 138(1), pp. 128-134. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000414
피인용 문헌
- Calculation Model for Function & Cost Score based on Normalization Method in Design VE vol.16, pp.4, 2015, https://doi.org/10.6106/KJCEM.2015.16.4.098
- A Preliminary Study of Prototype for Improving VE Workshop Phase based on BIM vol.16, pp.3, 2015, https://doi.org/10.6106/KJCEM.2015.16.3.113
- The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - vol.16, pp.2, 2015, https://doi.org/10.6106/KJCEM.2015.16.2.012
- BIM-based idea bank for managing value engineering ideas vol.35, pp.4, 2017, https://doi.org/10.1016/j.ijproman.2016.09.015