References
- Azzi, A., Faccio, M., Persona, A. and Sgarbossa, F., "Lot Splitting Scheduling Procedure for Makespan Reduction and Machine Capacity Increase in a Hybrid Flow Shop with Batch Production", International Journal of Advanced Manufacturing Technology, Vol. 59, No. 5-8, pp.775-786, 2012. https://doi.org/10.1007/s00170-011-3525-x
- Hirano, S., Kobayashi, S. and Eguchi, T., "Integrated Production Planning and Scheduling Using Backward/Forward Scheduling Simulation", Proceedings of ICROS-SICE International Joint Conference, Fukuoka, Japan, pp.2631-2635, 2009.
- Hunsucker, J.L. and Shah, J.R., "Comparative Performance Analysis of Priority Rules in a Constrained Flow Shop with Multiple Processor Environment", European Journal of Operational Research, Vol. 72, No. 1, pp.102-114, 1994. https://doi.org/10.1016/0377-2217(94)90333-6
- Kim, H.J., Kim, J.H., Kim, Y.G., Song, J.Y. and Moon, D.H., "A Simulation Study on the Development of Injection Mold for the Parts of Phone Camera Lens Module", Journal of the Korea Society for Simulation, Vol. 22, No. 4, pp.83-92, 2013. https://doi.org/10.9709/JKSS.2013.22.4.083
- Koo, P.H. and Moon, D.H., "A Review on Control Strategies of Batch Processing Machines in Semiconductor Manufacturing", Preprints of the 2013 IFAC Conference on Manufacturing Modeling, Management and Control, Saint Petersburg, Russia pp.1712-1717, 2013.
- Mahmoodi, F., Mosier, C.T., and Guerin, R.E., "The Effect of Combining Simple Priority Heuristics in Flow- Dominant Shops", International Journal of Production Research, Vol. 34, No. 3, pp.819-839, 1996. https://doi.org/10.1080/00207549608904936
- Qian, B., Wang, L. Huang, D., Wang, W. and Wang, X., "An Effective Hybrid DE-based Algorithm for Multi-objective Flow Shop Scheduling with Limited Buffers", Computers and Operations Research, Vol.36, No.1, pp.209-233, 2009. https://doi.org/10.1016/j.cor.2007.08.007
- Ribas, I., Leisten, R. and Framinan, J.M., "Review and Classification of Hybrid Flow Shop Scheduling Problems from a Production System and a Solutions Procedure Perspective", Computers and Operations Research, Vol. 37, No. 8, pp.1439-1454, 2010. https://doi.org/10.1016/j.cor.2009.11.001
- Song, J.Y., Ha, T.H., Lee, C.W., Kim, D.H. and Jeon, J., "Automatic Combination and Assembly System for Phone Camera Lens Module", Transactions of the Korean Society of Mechanical Engineers A, Vol. 38, No. 2, pp.219-225, 2014 https://doi.org/10.3795/KSME-A.2014.38.2.219
- Sule, D.R., Industrial Scheduling, PWS Publishing Company, Boston, U.S.A., 1997.
- Takaku, K. and Yura, K., "Online Scheduling Aiming to Satisfy Due Date for Flexible Flow Shops", JSME International Journal. Series C, Mechanical Systems, Machine Elements and Manufacturing, Vol. 48, No.1, pp.21-25, 2005. https://doi.org/10.1299/jsmec.48.21
- Voss, S. and Witt, A., "Hybrid Flow Shop Scheduling as a Multi-mode Multi-project Scheduling Problem with Batching Requirements: A Real-world Application", International Journal of Production Economics, Vol. 105, No. 2, pp.445-458, 2007. https://doi.org/10.1016/j.ijpe.2004.05.029