References
- H. D. K. a. S. Y. Kim, "Barriers of Last Planner System: A Survey in Vietnam Construction Industry," KICEM Journal of Construction Engineering and Project Management, 2013. https://doi.org/10.6106/JCEPM.2013.3.4.005
- B. Adams, king and Cleland, Project Management Hand Book, 1983.
- M. T. Callahan, D. G. Quackenbush, and J. E. Rowings,Construction project scheduling, 1992.
- L. Richman, Project management step-by-step: Amacom, 2002.
- Y. H. Kwak and C. W. Ibbs, "Project management process maturity (PM) 2 model," Journal of Management in Engineering, vol. 18, pp. 150-155, 2002.
- S. Globerson and O. Zwikael, "The impact of the project manager on project management planning processes," Project Management Journal, vol. 33, pp. 58-64, 2002.
- PMI, Project Management Body of Knowledge (PMBOK, 4th ed. USA: Project Management Institute, 2008.
- S. A. Mubarak, Construction project scheduling and control: Wiley. com, 2010.
- J.-B. Yang and C.-K. Kao, "Critical path effect based delay analysis method for construction projects," International Journal of Project Management, vol. 30, pp. 385-397, 2012. https://doi.org/10.1016/j.ijproman.2011.06.003
- G. Kikwasi, "Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania," in Australasian Journal of Construction Economics and Building-Conference Series, 2013, pp. 52-59.
- T. J. Trauner Jr, Construction delays: understanding them clearly, analyzing them correctly: Butterworth-Heinemann, 2009.
- N. Braimah, "Construction Delay Analysis Techniques-A Review of Application Issues and Improvement Needs," Buildings, vol. 3, pp. 506-531, 2013. https://doi.org/10.3390/buildings3030506
- W. Ibbs and L. D. Nguyen, "Schedule analysis under the effect of resource allocation," Journal of construction engineering and management, vol. 133, pp. 131-138, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(131)
- J. Brown and R. L. Governor, Robert Pieplow,Mark Leja, "Project Scheduling with Primavera P6," State of california2011.
- J.-B. Yang and C.-K. Kao, "Review of Delay Analysis Methods: A Process-Based Comparison," Open Construction & Building Technology Journal, vol. 3, 2009.
- H. Ismael. (2012, 10th November-2013). what is the time schedule and what is the types of the schedules.Available: http://www.planningengineer.net/what-is-the-time-schedule-andwhat- is-the-types-of-the-schedules/
- M. A. Halloum and A. Bajracharya, "Cost and Time Overrun Revisited: A Study on the Infrastructure Construction Projects in Abu Dhabi, UAE," Third International Conference on Construction in Developing Countries (ICCIDC-III), 2012.
- O. Motaleb and M. Kishk, "An investigation into causes and effects of construction delays in the UAE," in Proceedings of the 26 th Annual Conference of the Association of Researchers in Construction Management, 2010, pp. 1149-1157.
- A. Shebob, N. Dawood, And Q. Xu, "Analysing Construction Delay Factors: A Case Study Of Building Construction Project In LIBYA," Management, vol. 1005, p. 1012, 2011.
- T. P. a. A. Ismail, "Causes and Effects of Delay in Iranian Construction Projects," ACSIT International Journal of Engineering and Technology, vol. 4, pp. 598-601, 2012. https://doi.org/10.7763/IJET.2012.V4.441
- S. M. Hafez and H. M. Elsaka, "Identifying potential delay situations in advance to define construction contract obligations of public buildings," International Journal of Education and Research, vol. 1, pp. 1-8, 2013.
- D. Kagiri and G. Wainaina, "Time and cost overruns in power projects in Kenya: A case study of Kenya electricity generating Company limited," 2005.
- Y. Rahsid, S. ul Haq, and M. S. Aslam, "Causes of Delay in Construction Projects of Punjab-Pakistan: An Empirical Study," Humanity & Social Sciences Journal,vol. 8, pp.56-67, 2013.
- M. Sambasivan and Y. W. Soon, "Causes and effects of delays in Malaysian construction industry," International Journal of Project Management, vol. 25, pp. 517-526, 2007. https://doi.org/10.1016/j.ijproman.2006.11.007
- X.-L.M.Haseeb,Aneesa Bibi, Maloof-ud-Dyian, Wahab Rabbani, "Causes and Effects of Delays in Large Construction Projects of Pakistan," Kuwait Chapter of Arabian Journal of Business and Management Review, vol.1, 2011.
- S. Shah, A. Khan, and M. Khalil, "Project Management Practices in e-Government Projects: A Case Study of Electronic Government Directorate (EGD) in Pakistan," International Journal of Business and Social Science, vol. 2, 2011.
- M. A. a. J. S. S.Mubin, "Terminal Evaluation of Public Sector Development Projects: An Analysis of 85 Evaluated Development Projects of Punjab Province " Pak. J. Engg. & Appl. Sci., vol. 9, pp. 58-67, July-2011.
- P. Comission, "Guidelines for Project Management in Pakistan. Islamabad: Planning Comission," 2008.
- S. a. Patil, "Statistical Methods for Construction Delay Analysis " IOSR Journal of Mechanical and Civil Engineering(IOSR-JMCE), vol. 9, pp. 58-62, 2013.
Cited by
- 4P delays in project management 2018, https://doi.org/10.1108/ECAM-09-2016-0199