A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad (Department of Industrial Engineering & Management Sciences. University of Engineering & Technology) ;
  • Choudhary, Muhammad Abbas (Department of Industrial Engineering & Management Sciences. University of Engineering & Technology) ;
  • Jahanzaib, Mirza (Department of Industrial Engineering & Management Sciences. University of Engineering & Technology)
  • Published : 2014.12.01

Abstract

Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Keywords

References

  1. H. D. K. a. S. Y. Kim, "Barriers of Last Planner System: A Survey in Vietnam Construction Industry," KICEM Journal of Construction Engineering and Project Management, 2013. https://doi.org/10.6106/JCEPM.2013.3.4.005
  2. B. Adams, king and Cleland, Project Management Hand Book, 1983.
  3. M. T. Callahan, D. G. Quackenbush, and J. E. Rowings,Construction project scheduling, 1992.
  4. L. Richman, Project management step-by-step: Amacom, 2002.
  5. Y. H. Kwak and C. W. Ibbs, "Project management process maturity (PM) 2 model," Journal of Management in Engineering, vol. 18, pp. 150-155, 2002.
  6. S. Globerson and O. Zwikael, "The impact of the project manager on project management planning processes," Project Management Journal, vol. 33, pp. 58-64, 2002.
  7. PMI, Project Management Body of Knowledge (PMBOK, 4th ed. USA: Project Management Institute, 2008.
  8. S. A. Mubarak, Construction project scheduling and control: Wiley. com, 2010.
  9. J.-B. Yang and C.-K. Kao, "Critical path effect based delay analysis method for construction projects," International Journal of Project Management, vol. 30, pp. 385-397, 2012. https://doi.org/10.1016/j.ijproman.2011.06.003
  10. G. Kikwasi, "Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania," in Australasian Journal of Construction Economics and Building-Conference Series, 2013, pp. 52-59.
  11. T. J. Trauner Jr, Construction delays: understanding them clearly, analyzing them correctly: Butterworth-Heinemann, 2009.
  12. N. Braimah, "Construction Delay Analysis Techniques-A Review of Application Issues and Improvement Needs," Buildings, vol. 3, pp. 506-531, 2013. https://doi.org/10.3390/buildings3030506
  13. W. Ibbs and L. D. Nguyen, "Schedule analysis under the effect of resource allocation," Journal of construction engineering and management, vol. 133, pp. 131-138, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(131)
  14. J. Brown and R. L. Governor, Robert Pieplow,Mark Leja, "Project Scheduling with Primavera P6," State of california2011.
  15. J.-B. Yang and C.-K. Kao, "Review of Delay Analysis Methods: A Process-Based Comparison," Open Construction & Building Technology Journal, vol. 3, 2009.
  16. H. Ismael. (2012, 10th November-2013). what is the time schedule and what is the types of the schedules.Available: http://www.planningengineer.net/what-is-the-time-schedule-andwhat- is-the-types-of-the-schedules/
  17. M. A. Halloum and A. Bajracharya, "Cost and Time Overrun Revisited: A Study on the Infrastructure Construction Projects in Abu Dhabi, UAE," Third International Conference on Construction in Developing Countries (ICCIDC-III), 2012.
  18. O. Motaleb and M. Kishk, "An investigation into causes and effects of construction delays in the UAE," in Proceedings of the 26 th Annual Conference of the Association of Researchers in Construction Management, 2010, pp. 1149-1157.
  19. A. Shebob, N. Dawood, And Q. Xu, "Analysing Construction Delay Factors: A Case Study Of Building Construction Project In LIBYA," Management, vol. 1005, p. 1012, 2011.
  20. T. P. a. A. Ismail, "Causes and Effects of Delay in Iranian Construction Projects," ACSIT International Journal of Engineering and Technology, vol. 4, pp. 598-601, 2012. https://doi.org/10.7763/IJET.2012.V4.441
  21. S. M. Hafez and H. M. Elsaka, "Identifying potential delay situations in advance to define construction contract obligations of public buildings," International Journal of Education and Research, vol. 1, pp. 1-8, 2013.
  22. D. Kagiri and G. Wainaina, "Time and cost overruns in power projects in Kenya: A case study of Kenya electricity generating Company limited," 2005.
  23. Y. Rahsid, S. ul Haq, and M. S. Aslam, "Causes of Delay in Construction Projects of Punjab-Pakistan: An Empirical Study," Humanity & Social Sciences Journal,vol. 8, pp.56-67, 2013.
  24. M. Sambasivan and Y. W. Soon, "Causes and effects of delays in Malaysian construction industry," International Journal of Project Management, vol. 25, pp. 517-526, 2007. https://doi.org/10.1016/j.ijproman.2006.11.007
  25. X.-L.M.Haseeb,Aneesa Bibi, Maloof-ud-Dyian, Wahab Rabbani, "Causes and Effects of Delays in Large Construction Projects of Pakistan," Kuwait Chapter of Arabian Journal of Business and Management Review, vol.1, 2011.
  26. S. Shah, A. Khan, and M. Khalil, "Project Management Practices in e-Government Projects: A Case Study of Electronic Government Directorate (EGD) in Pakistan," International Journal of Business and Social Science, vol. 2, 2011.
  27. M. A. a. J. S. S.Mubin, "Terminal Evaluation of Public Sector Development Projects: An Analysis of 85 Evaluated Development Projects of Punjab Province " Pak. J. Engg. & Appl. Sci., vol. 9, pp. 58-67, July-2011.
  28. P. Comission, "Guidelines for Project Management in Pakistan. Islamabad: Planning Comission," 2008.
  29. S. a. Patil, "Statistical Methods for Construction Delay Analysis " IOSR Journal of Mechanical and Civil Engineering(IOSR-JMCE), vol. 9, pp. 58-62, 2013.

Cited by

  1. 4P delays in project management 2018, https://doi.org/10.1108/ECAM-09-2016-0199