References
- MLTM, 2011, Manual on rail afair, Ministry of Land, Transport and Maritime Affairs, 235p (in Korean).
- Molit, 2013, Current status of bridges and tunnels, e-narajipyo, Ministry of Land Infrastructures andTransport, (http://www.index.go.kr/egams/stts/jsp/potal/stts/PO_STT S_IdxMain.jsp?idx_cd= 1213&bbs=INDX_001&clas_div=A) (in Korean).
- Lee, S.K, Kim, J.W, and Suh, K, C, 2002, Hanriver tunnel, Tunnelling Technology, 2, 3, 40-47.
- Kim, Y.I, Kim, D.H, and Cho, S.K, 2003, Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway, Proc. of Fall Annual Conference, The Korean Society for Railway, 569-578.
- Kyung, S.H, Yoon, S.H, and Kwak, T.H, 2000, Case study of Kumho river tunnel, Tunnelling Technology, 44-58.
- Oh, B, S, Yoon H,D, Choi, K.H, and Lim J, S, 2007, A Study of large diameter shield TBM excavation passing through Soo-Young Riverbed in Pussan (Pussan Subway Line II, Section 230), Proc. of KSCE Tunnel Committee Special Conference, 27th Dec., 75-95.
- Shin, H.S, 2006, Subsea tunnels and related technology, Proc. of the Rock Mechanics Symposium, Korean Society for Rock Mechanics, 1-10(in Korean).
- Huh, D.H, Park, M.R, and Hong, E, J, 2012, The first design case of the mined subsea road tunnel(Boryung)in Korea, Yooshin Journal. No.18, pp.277-292 (in Korean).
- Seoul Development Institute, 2006, The establishment of the masterplan for underground space development in Seoul Metropolitan, 503p (in Korean).
- National Underground Shoppingmall Union, 2013, Current status of underground shopping mall in Korea (http://www.edaehyun.com/family/family_underko.html) (in Korean).
- Jeon, J.S., Jung, W.S., and Park H.G., 2007, Water supply tunnels for multi-regional and industrial water supply system in Korea, Korean Society of Civil Engineers, 55, 8, 116-123 (in Korean).
- Kwater, 2012, Annual report of water resources management, Korea Water Resources Corporation, 447p (in Korean).
- KTA, 2009, Tunnels and underground space in Korea, Korea Tunnelling Association, CIR, Seoul, 498p (in Korean).
- KNOC, 2013, Operation of stockpiling facilities, Korea National Oil Corporation (www.knoc.co.kr/sub03/sub03_ 4_3. jsp) (in Korean).
- Shin, H.S., Bae, G. J., and Lee, C. I., 2001, The design and construction of underground space in Korea, Proc. of the 2nd Asian Rock Mechanics Symposium, 23-26.
- Gyusang Lee and Chungin Lee, 2005, Analysis of in-situ temperature measurement at Gonjiam cold storage cavern, Tunnel & Underground Space, Journal of Korean Society for Rock Mechanics, 15, 3 169-176 (in Korean).
- Yongbok Jung, Chan Park, Sokeul Chung, Woocheol Jeong, and Hoyeong Kim, 2006, Simulation of ice ring formation around cryogenic underground storage cavern using hydro-thermal coupling method, Tunnel & Underground Space, Journal of Korean Society for Rock Mechanics. 16, 3, 241-250 (in Korean).
- Changsoo Lee, Sangki Kwon, Jongwon Choi, and Seokwon Jeon, 2011, An estimation of the excavation damaged zone at the KAERI underground research tunnel, Tunnel & Underground Space, Journal of Korean Society for Rock Mechanics, 21, 5, 359-369 (in Korean).
- Chansung Oh and Junmo Kim, 2008, Three-dimensional numerical simulation of groundwater flow and salt and radionuclide transport at a low and intermediate level radioactive waste disposal site in Gyeongju, Korea, Journal of the Geological Society of Korea, 44, 4, 489-505 (in Korean).
Cited by
- An Experimental Study on Evacuation Ability During Underground Space Inundation vol.15, pp.2, 2015, https://doi.org/10.9798/KOSHAM.2015.15.2.189
- Variation of Rock Properties in Acidic Solution and Loading Condition vol.26, pp.3, 2016, https://doi.org/10.7474/TUS.2016.26.3.154