Magazine of the Korea Concrete Institute (콘크리트학회지)
- Volume 25 Issue 4
- /
- Pages.20-23
- /
- 2013
- /
- 1018-1415(pISSN)
DOI QR Code
Rebar Detail Design and Construction Management Based on BIM
BIM을 이용한 배근상세 설계 및 공사 관리기술
- Published : 2013.07.30
Abstract
Keywords