Magazine of the Korea Concrete Institute (콘크리트학회지)
- Volume 25 Issue 2
- /
- Pages.29-33
- /
- 2013
- /
- 1018-1415(pISSN)
DOI QR Code
Reinforcement Method for Shortening the Construction Period of RC Building
RC 건축물 공사의 공기단축을 위한 철근조립공법
- Published : 2013.03.31
Abstract
Keywords