References
- Everett JG, Slocum AH. Automation and robotics opportunities: construction versus manufacturing. Journal of Construction Engineering and Management. 1994 Mar;120(2):443-52. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(443)
- Oh D, Lee Y, Lee UK, Doh N, Cho H, Kang KI. Performance evaluation index for comparing traditional construction methods with a robot-based automated construction method. In The 3rd International Conference on Construction Engineering and Management, Final program and Abstract book; 27-29 May 2009; Jeju, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2009. p. 1088-94.
- Lee JH, Yoo HS, Kim YS, Lee JB, Cho MY. The development of a machine vision : assisted teleoperated pavement crack sealer. Automation in Construction. 2006 Sep;15(5):616-26. https://doi.org/10.1016/j.autcon.2005.06.018
- Ham YB, Kwon SW, Noh JH, Han JG, Kim KT. Development of road stripe removing equipment using high-pressure water jet. Automation in Construction. 2006 Sep;15(5):578-88. https://doi.org/10.1016/j.autcon.2005.06.017
- Woo S, Hong D, Lee W-C, Chung J-H, Kim T-H. A robotic system for road lane painting. Automation in Construction. 2008 Jan;17(2):122-9. https://doi.org/10.1016/j.autcon.2006.12.003
- Li Z, Madanu S. Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. Journal of Transportation Engineering. 2009 Aug;135(8):516-26. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000012
- Zhou H, Williams KM, Farah W. Methodology to evaluate the effects of access control near freeway interchange areas. Journal of Transportation Engineering. 2008 Dec;134(12):504-11. https://doi.org/10.1061/(ASCE)0733-947X(2008)134:12(504)
- Jang WS, Skibniewski MJ. Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management. 2009 May;135(5):378-86. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:5(378)
- Shin YS, Choi HB, Lee UK, An SH, Kang KI. A study on selection of slab formwork system for high-rise building construction. Journal of Architectural Institute of Korea: Structure & Construction Section. 2006 Feb;22(2):147-54.
- Linstone HA, Turoff M. The Delphi method: techniques and applications. Newark (MA): Addison-Wesley; 1975. 616. p.
- Saaty TL. The analytic hierarchy process: planning, priority setting, resource allocation. New York (NY): McGraw-Hill; 1980. 57. p.
- Korea Institute of Construction Technology. Standard quantities per unit of construction projects in Korea. Seoul (Korea): Ministry of Land, Transport and Maritime Affairs; 2010. p. 917-28.
- Boehm B. Software engineering economics. Englewood Cliffs (NJ): Prentice-Hall, Inc.: 1980. 385 p.
- Boehm B, Abts C, Chulani S. Software development cost estimation approaches-a survey. Annals of Software Engineering. 2000 Mar;10(1-4):177-205. https://doi.org/10.1023/A:1018991717352
- Kang TK, Nam C, Lee UK, Doh N, Park GT. Development of robotic crane-based automatic construction system for steel structures of high-rise buildings. In The 28th International Symposium on Automation and Robotics in Construction; 29 June-2 July 2011; Seoul, Korea. Seoul: International Association for Automation and Robotics in Construction; 2011. p. 670-1.
- Kim K, Kim G, Kim K, Lee Y, Kim J. Real-time progress management system for steel structure construction. Journal of Asian Architecture and Building Engineering. 2009 May;8(1):111-18. https://doi.org/10.3130/jaabe.8.111
- Jin IG, Shin Y, Cho H, Kang KI. Development of component design process for automated construction system. Korean Journal of Construction Engineering and Management. 2009 Jul;10(4):76-86.
- Chu B, Jung K, Ko KH, Hong D. Mechanism and analysis of a robotic bolting device for steel beam assembly. In International Conference on Control, Automation and Systems; 2010 Oct; Ilsan, Korea. Seoul: Institute of Control, Robotics and Systems; 2010. p. 2351-6.
- Saaty TL, Vargas LG. Models, methods, concepts and applications of the analytic hierarchy process. Norwell (MA): Kluwer Academic Publishers; 2001. 335. p.
Cited by
- Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project vol.15, pp.3, 2015, https://doi.org/10.5345/JKIBC.2015.15.3.339