DOI QR코드

DOI QR Code

Adoption of Virtual Technology to the Development of a BIM based PMIS

  • Suh, Bong-Gyo (Department of Architectural Engineering, Graduate School Gyeongsang National University) ;
  • Lee, Ghang (Department of Architectural Engineering, Yonsei University) ;
  • Yun, Seok-Heon (Department of Architectural Engineering, Engineering Research Institute, Gyeongsang National University)
  • Received : 2012.09.18
  • Accepted : 2013.06.28
  • Published : 2013.08.20

Abstract

As construction projects become bigger, PMIS is being used as a project collaboration tool for project participants, owners, designers, inspectors and contractors. As the data type used in PMIS is usually text and most PMIS have no standard information classification system, there is a problem with data usability, such as the capacity for data search and analysis. BIM uses Objects and Properties, and this information might be used for relating with other construction information. As such, BIM technologies can be used with PMIS to enhance the data usability. The web environment is very convenient for multiple users, but the problem is that the data transfer speed is low for big files such as BIM model files. In this study, we suggested a Virtual Technology (VT) application to enhance the performance of BIM data exchange in PMIS, and tested and analyzed its efficiency when it is used to integrate BIM and PMIS in the web environment. The results of the study showed that VT can be used to enhance the efficiency of BIM data exchange in the web environment.

Keywords

References

  1. Park CS. A Study on the Improvement for Efficient Model of PMIS [master's thesis]. [Busanv (Korea)]: Pukyong National University; 2009. 86 p.
  2. Azhar S, Hein M, Sketo B. Building Information Moeling(BIM):Benefit, Risks and Challenges. Proceedings of the 44th ASC National Conference; 2008 April 2-5; Auburn University. Auburn, Alabama.: University of Southern Mississippi; 2008. 11 p.
  3. Kim JG, Hyun KM, Kim W, Kim OK. Example Analysis and Development of Project Management Information System-Case Study of Subway Construction in D. Area. Journal of Architectural Institute of Korea. 2005 Nov;11(1):593-6.
  4. Kim JH. Effective Application of PMIS through Analysis of Barriers At the Development of PMIS. Journal of Korea Institute of Building Construction. 2005 Dec;5(4):107-15. https://doi.org/10.5345/JKIC.2005.5.4.107
  5. Jeon SH, Yun SH, Paek JH. A Study on Analysis of the Correlation between Building Information Modeling and Project Management Information System. Journal of Architectural Institute of Korea. 2007 Oct;27(1):757-60.
  6. Moon SW, Kwon KN, Kim SD. Jung, JH. Application of BIM-based PMIS Considering Construction Life-Cycle. Proceedings of Korea Institute of Construction Engineering and Management; 2008 November 7-8; Korea Unversity (Korea). Seoul (Korea): KICEM; 2008. p. 655-8.
  7. Yoon SW, Chin SY, Shin TH, Choi CH. A Strategy for Building BIM+PMIS System. Proceedings of Korea Institute of Construction Engineering and Management; 2008 November 7-8; Korea University. Seoul (Korea): KICEM; 2008. p. 75-81.
  8. Jung JH. A Review on Exchange of Building Design Information based on IFC. Computational Structural Engineering Institute of Korea. Proceedings of the Computational Structural Engineering Institute Conference; 2009 April 16-17; Jeongseon (Korea). Seoul (Korea): COSEIK; 2009. p. 68-71.
  9. Lim JI, Kim JW, Kwon HD, Yoon SW, Kwon SW, Chin SY. IFC test between commercial 3D CAD application using IFC. Journal of Korea Institute of Construction Engineering and Management. 2008 Jun;9(3):85-94.
  10. Kim JW. A Study on the Interoperability Test and Model Improvement Bentley BIM Data through IFC system[master's thesis]. [Seoul (Korea)]: Seoul National University of Science & Technology; 2009. 63 p.
  11. Jeong JY. A study of efficient BIM data exchange and sharing [master's thesis]. [Seoul (Korea)]: Yonsei University; 2010. 56 p.
  12. Joana Prata dos Santos. Interaction and Visual Simulation in A Construction Environment. 1st International Conference on Pervasive and Embedded Computing Communication System; 2011 March 5-7; Vilamoura (Portugal). Portugal: SciTePress; 2011. p. 545-50.

Cited by

  1. Developing User Interfaces of Mobile PMIS Modules Based on Technology Demand Analysis vol.14, pp.3, 2014, https://doi.org/10.5345/JKIBC.2014.14.3.244
  2. Database-Supported and Web-Based Visualization for Daily 4D BIM vol.143, pp.10, 2017, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001392