References
- Park KJ. The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure. Journal of the Korea Institute of Building Construction. 2005 Mar;5(1):97-103. https://doi.org/10.5345/JKIC.2005.5.1.097
- Choi OY, Kim TH, Kim GH. A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing. Journal of the Korea Institute of Building Construction. 2008 Oct;8(5):127-35. https://doi.org/10.5345/JKIC.2008.8.5.127
- Lee DJ, Park SJ, Chun JY. A Study on DB Constitutional Model for Building Elemental Cost Analysis in the Early Design Stage. Journal of Architectural Institute of Korea. 2003 Oct;23(2):599-603.
- Park KJ, Lee JH, Jeong JY, Jeong MW. Cost Model for Cost Saving on Each Building Phase by Integration of Cost Factor. Journal of Architectural Institute of Korea. 2002 Jul;18(7):87-95.
- Kim SK, Jeon YH, Han CH. The Boundary Condition of Building Elements and a Case Study. Journal of Architectural Institute of Korea. 2001 Mar;17(3):59-67.
- Jeong JH, Sinin HW, Ryu HG, Kim GH, Kim TH. Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis. Journal of the Korea Institute of Building Construction. 2012 Oct;12(5):528-39. https://doi.org/10.5345/JKIBC.2012.12.5.528
- Hyun CT, Hong TH, Koo KJ, Yeon HJ, Moon HS, Cho KM. Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects. Korea Institute of Construction Engineering and Management. 2007 Dec;8(6):178-88.
- Kang HY, Kim YS. A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy. Korea Institute of Construction Engineering and Management. 2010 Jan:11(1):142-50. https://doi.org/10.6106/KJCEM.2010.11.1.142
- Chun JY, Park KJ, Oh SJ, Kwon BS. A Study on the Rational Process of Cost-Saving Method of Each Architectural Stage: Focused on the Design and Construction Stage. Journal of Architectural Institute of Korea. 2000 Oct;20(2):571-75.
- Hyun CT, Hong TH, Son MJ, Lee HC, Ha SH. Development of the Cost Breakdown Structure Organization Tool for the Planning Phase of Mixed Used Development Projects. Journal of Architectural Institute of Korea. 2009 Aug;25(8):185-95.
- Yun SH, Kim SS. Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information. Korea Institute of Construction Engineering and Management. 2005 Dec;6(6):107-15.
- Lee JY, Jeon YI. A Study on the Requirements for a Framework of a Construction Information Classification System. Journal of Architectural Institute of Korea. 1998 Jun;14(6):57-66.
- Lee KS, Park HP, Oh U, Park SH. A Study on the Establishment Plan of Integrated Construction Information Classification. Korea Institute of Construction Engineering and Management. 2002 Jun;3(2):99-107.
- Lee JY. A Study on the Conceptual Basis of the Construction Information Classification Systems. Journal of Architectural Institute of Korea. 2000 Nov;16(11):3-11.
- Pack HP, Won SW, Koo JD, Lee KS. A Study on the Standardization of construction Information classification System in Korea. Journal of Architectural Institute of Korea. 1996 Jun;1(6):231-41.
- Chua D, Godinot M. Use of a WBS Matrix to Improve Interface Management in Projects. Journal of Construction Engineering and Management. 2006 Jan;132(1):67-79. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67)
- Jung, YS, Woo S. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Journal of Construction Engineering and Management. 2004 Oct;130(5):616-25. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)