DOI QR코드

DOI QR Code

A Study of the Value of Travel Time Reliability

통행시간 신뢰성 가치에 관한 연구

  • 조한선 (한국교통연구원 교통안전.도로본부)
  • Received : 2013.04.18
  • Accepted : 2013.06.04
  • Published : 2013.08.16

Abstract

PURPOSES : Benefits for improvement of travel time reliability obtained from construction of new highways should be considered as a major factor in the feasibility study for highway constructions. The purpose of this study is to develop a method of estimation for the value of travel time reliability. METHODS : Highway type (urban/rural highway) and traffic flow type(interrupted/uninterrupted) was considered to estimate he value of travel time reliability. And Double-bounded Dichotomous Choice among Contingent Valuation Method(CVM) was applied to survey the willingness-to-pay of drivers when travel time reliability is improved. Finally the value of travel time reliability was estimated using the results of survey and logit model. The value of travel time reliability was estimated considering travel objectives, time constraint travel and non-time constraint travel. RESULTS: The value of travel time reliability of business trip is higher than that of non-business trip. The value of travel time reliability of time constraint travel is higher than that of non-time constraint travel. The value of travel time reliability in urban area is higher than that in rural area. CONCLUSIONS: It was concluded that the proposed method in this study is more realistic and proper to estimate the value of travel time reliability because it reflects the situations of time constraint travel and non-time constraint travel.

Keywords

References

  1. Arrow, K., Solow, R, Portney, Leamer, E., Radner, R., and Schuman, H.,(1993), Report of the NOAA panel on contingent valustion, Federal Register, Vol. 58, 4601-4614.
  2. Choi Y., Choi M. H., (2005), Measuring the Flood Risk Perception of Residents by Employing a Double-Bounded Dichotomous Choice Contingent Valuation Method, J. Korea Planners Association, Vol.40 No.4. pp187-199.
  3. Department of Transport, New Approach to Appraisal(2009), United Kingdom
  4. Korea Development Institute (2008), A Study on Standard Guideline for Pre-Feasibility Study on Road and Railway Projects (5h Edition), Seoul, Korea
  5. Ministry of Land, Transport and Maritime Affairs (2009), Manual of Investment Assessment for Transport Facilities(3rd Edition), Gyeonggi-do, Korea
  6. Ministry of Land, Transport and Maritime Affairs (2011), Manual of Investment Assessment for Transport Facilities(4th Edition), Gyeonggi-do, Korea
  7. Strategic Rail Authority (2003), Appraisal Criteria, United Kingdom
  8. The Korea Transport Institute(2008), Improved methodologies for estimating benefits of railway schemes in the transport appraisal, Gyeonggi-do, Korea