DOI QR코드

DOI QR Code

Employment Contract-Based Management Model of Production Resources on Relation-Driven Fractal Organization

관계주도형 프랙탈 조직에서의 고용계약 기반 생산자원 관리모형

  • Shin, Moonsoo (Department of Industrial and Management Engineering, Hanbat National University)
  • 신문수 (한밭대학교 산업경영공학과)
  • Received : 2013.01.28
  • Accepted : 2013.02.20
  • Published : 2013.08.15

Abstract

Up-to-date market dynamics and intense competition have forced a production system to be more widely distributed and decentralized than ever, and the production system itself can be regarded as a collaborative network of autonomous production resources in which the responsibility of decision making is also decentralized into individual autonomous entities. The conventional resource management models, however, are not suitable for the distributed and decentralized environment because of their centralized nature. In this paper, an agent-based resource management model is proposed. The proposed model applies employment relation-driven fractal organization (FrOrg) into organizational model for distributed production resources and presents a resource management framework based on employment contracts. The fractal organization is a structured association in which a self-similar pattern recursively appears, and employment relations between production resources are recursively constructed throughout the entire production system.

Keywords

References

  1. Askin, R. G., Ciarallo, F. W., and Lundgren, N. H. (1999), An empirical evaluation of holonic and fractal layouts, International Journal of Production Research, 37, 961-978. https://doi.org/10.1080/002075499191355
  2. Baykasoglu, A. (2003), Capability-based distributed layout approach for virtual manufacturing cells, International Journal of Production Research, 41(11), 2597-2618. https://doi.org/10.1080/0020754031000087229
  3. Benjaafar, S., Heragu, S., and Irani, S. (2002), Next generation factory layouts : research challenges and recent progress, Interfaces, 32(6), 58-76. https://doi.org/10.1287/inte.32.6.58.6473
  4. Bongaerts, L., Monostori, L., McFarlane, D., and Kadar, B. (2000), Hierarchy in distributed shop floor control, Computers in Industry, 43, 123-137. https://doi.org/10.1016/S0166-3615(00)00062-2
  5. Caramia, M. and Dell'Olmo, P. (2006), Effective Resource Management in Manufacturing Systems : Optimization Algorithms for Production Planning, Springer, London.
  6. Chen, W., Huang, C., and Lai, Y. (2009), Multi-tier and multi-site collaborative production : illustrated by a case example of TFT-LCD manufacturing, Computers and Industrial Engineering, 57(1), 61-72. https://doi.org/10.1016/j.cie.2008.08.012
  7. Dewan, P. and Joshi, S. (2002), Auction-based distributed scheduling in a dynamic job shop environment, International Journal of Production Research, 40(5), 1173-1191. https://doi.org/10.1080/00207540110098445
  8. Dilts, D. M., Boyd, N. P., and Whorms, H. H. (1991), The evolution of control architectures for automated manufacturing systems, Journal of Manufacturing Systems, 10(1), 79-93. https://doi.org/10.1016/0278-6125(91)90049-8
  9. Groover, M. P. (2001), Automation, Production Systems, and Computer-Integrated Manufacturing, Prentice Hall, New Jersey, USA.
  10. Heragu, S. S., Graves, R. J., Kim, B., and St. Onge, A. (2002), Intelligent agent based framework for manufacturing systems control, IEEE Transactions on Systems, Man, and Cybernetics, 32(5), 560-573. https://doi.org/10.1109/TSMCA.2002.804788
  11. Jung, D. (2012), Just-in-time scheduling with multiple competing agents, Journal of the Korean Operations Research and Management Science Society, 37(1), 19-28.
  12. Kanyalkar, A. P. and Adil, G. K. (2007), Aggregate and detailed production planning integrating procurement and distribution plans in a multi-site environment, International Journal of Production Research, 45(22), 5329-5353. https://doi.org/10.1080/00207540600632174
  13. Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritschow, G., Ulsoy, A. G., and Van Brussel, H. (1999), Reconfigurable manufacturing system, Annals of the CIRP, 48(2), 527-540. https://doi.org/10.1016/S0007-8506(07)63232-6
  14. Lee, K., Ryu, K., Moon, I., and Jung, M. (2011), Framework for self-reconfigurable and collaborative supply chains and revenue sharing strategy based on trust models of enterprises, Journal of the Korean Institute of Industrial Engineers, 37(4), 323-330. https://doi.org/10.7232/JKIIE.2011.37.4.323
  15. Lima, R. M., Sousa, R. M., and Martins, P. J. (2006), Distributed production planning and control agent-based system, International Journal of Production Research, 44(15), 3693-3709. https://doi.org/10.1080/00207540600788992
  16. Mandelbrot, B. B. (1982), The Fractal Geometry of Nature, Freeman, New York.
  17. Montreuil, B., Venkatadri, U., and Rardin, R. L. (1999), Fractal layout organization for job shop environments, International Journal of Production Research, 37, 501-521. https://doi.org/10.1080/002075499191643
  18. Nigro, G. L., Bruccoleri, M., and Perrone, G. (2006), Negotiation in distributed production planning environments, International Journal of Production Research, 44(15), 3743-3758. https://doi.org/10.1080/00207540600575787
  19. Okino, N. (1993), Bionic manufacturing systems, Proceedings of the CIRP Seminar on Flexible Manufacturing Systems Past-Present-Future, 73-95.
  20. Rahimifard, S. (2004), Semi-heterarchical production planning structures in the support of team-based manufacturing, International Journal of Production Research, 42(17), 3369-3382. https://doi.org/10.1080/00207540410001717128
  21. Ryu, K. and Jung, M. (2003), Agent-based fractal architecture and modelling for developing distributed manufacturing systems, International Journal of Production Research, 41(17), 4233-4255. https://doi.org/10.1080/0020754031000149275
  22. Saad, S. M. and Lassila, A. M. (2004), Layout design in fractal organizations, International Journal of Production Research, 42(17), 3529-3550. https://doi.org/10.1080/00207540410001721790
  23. Seo, M. and Lim, D. (2011), Development of web-based simulator for supply chain network with reconfigurable manufacturing system and multi-layered distributed center, Journal of the Korean Institute of Industrial Engineers, 37(4), 279-288. https://doi.org/10.7232/JKIIE.2011.37.4.279
  24. Shen, W. (2002), Distributed manufacturing scheduling using intelligent agents, IEEE Intelligent Systems, 17, 88-94.
  25. Shin, M. and Jung, M. (2005), Bid generation and evaluation for MANProbased real time scheduling, International Journal of Production Research, 43(18), 3821-3836. https://doi.org/10.1080/00207540500142936
  26. Shin, M., Mun, J., and Jung, M. (2009a), Self-evolution framework of manufacturing systems based on fractal organization, Computers and Industrial Engineering, 56, 1029-1039. https://doi.org/10.1016/j.cie.2008.09.014
  27. Shin, M., Mun, J., Lee, K., and Jung, M. (2009b), r-FrMS : a relation-driven fractal organisation for distributed manufacturing systems, International Journal of Production Research, 47(7), 1791-1814. https://doi.org/10.1080/00207540802036240
  28. Shin, M. and Ryu, K. (2013), Agent-based resource model for relationdriven fractal organization, ICIC Express Letters, 7(5), 1539-1544.
  29. Tharumarajah, A. (2003), A self-organising view of manufacturing enterprises, Computers in Industry, 51, 185-196. https://doi.org/10.1016/S0166-3615(03)00035-6
  30. Tirpak, T. M., Daniel, S. M., LaLonde, J. D., and Davis, W. J. (1992), A note on a fractal architecture for modeling and controlling flexible manufacturing systems, IEEE Transactions on Systems, Man, and Cybernetics, 22, 564-567. https://doi.org/10.1109/21.155958
  31. Ueda, K. (1993), A generic approach toward future manufacturing system, Proceedings of the CIRP Seminar on Flexible Manufacturing Systems Past-Present-Future, 211-228.
  32. Van Brussel, H., Valckenaers, P., Bongaerts, L., and Wyns, J. (1995), Architectural and system desing issues in holonic manufacturing systems, Proceedings of 3rd IFAC Workshop on Intelligent Manufacturing Systems.
  33. Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L., and Peeters, P. (1998), Reference architecture for holonic manufacturing systems : PROSA, Computers in Industry, 37, 255-274. https://doi.org/10.1016/S0166-3615(98)00102-X
  34. Venkatadri, U., Rardin, R. L., and Montreuil, B. (1997), A design methodology for fractal layout organization, IIE Transactions, 29, 911-924.
  35. Wang, K., Veeramani, D., and Chen, J. (2004), Distributed production planning using a graph-based negotiation protocol, International Journal of Production Research, 42(15), 3077-3099. https://doi.org/10.1080/00207540410001691947
  36. Warnecke, H. J. (1993), The Fractal Company : A Revolution in Corporate Culture, Springer-Verlag, Berlin.
  37. Wiendahl, H. and Lutz, S. (2002), Production in Networks, CIRP Annals-Manufacturing Technology, 51(2), 573-586. https://doi.org/10.1016/S0007-8506(07)61701-6