초록
This paper is about the first experiment in Korea that was conducted on speeding increase up with rail speeds at 430km/h at high speed railway of designed 350km/h. and analysis data collected on vibration accelerations of roadbed. There are barely references on roadbed behavior measurement with rail speeds more than 350 km/h in Korea as it has never been conducted the experiment on it. So the experiments were confirmed the reliability through crosschecking the figures/values from respective sensors and measuring devices after measuring EMS and ICP types. Based on the study, values of vibration acceleration were less than 12% compared with the ones that conducted while speeding up of HEMU-430X. Also, figures of HSB for concrete bed tracks were 52% against the standard. According to the results, all the performance evaluation of vibration acceleration for roadbeds in transition zones is under the standard.