References
- Lee, S.H. and Shin, Y.G., 1990, Assembly Planning Based on Subassembly Extraction, Proceedings 1990 IEEE International Conference on Robotics and Automation, pp.1606-1611.
- Kim, J.J., 1997, An Application of Screw Motions for Mechanical Assemblies, Transactions of the Society of CAD/CAM Engineers, 2(1), pp.60-67.
- Kim, K.S. and Choi, H.G., 2005, STEP-based Algorithms for Extraction and Code Generation of Assembly Information, Transactions of the Society of CAD/CAM Engineers, 10(6), pp.412-420.
- Liu, Y., Liu, X. and Li, Q., 2012, Part Assembly Sequence Planning Based on Ant Colony Algorithm, Future Communication, Computing, Control and Management (Proceeding of ICF4C 2011), Springer, pp.397-404.
- Bourjault, A., 1992, Computer-aided assembly process planning, Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 206(1), pp.61-66.
- De Fazio, T.L. and Whitney, D.E., 1987, Simplified Generation of All Mechanical Assembly Sequences, IEEE Journal of Robotics and Automation, 3(6), pp.640-658. https://doi.org/10.1109/JRA.1987.1087132
- Mello, L.H.D. and Sanderson, A., 1990, AND/ OR G raph Representation of Assembly Plans, IEEE Journal of Robotics and Automation, 6(2), pp.188-199. https://doi.org/10.1109/70.54734
- Demoly, F. et al., 2011, Geometric Skeleton Computation Enabling Concurrent Product Engineering and Assembly Sequence Planning, Computer-Aided Design, 43(12), pp.1654-1673. https://doi.org/10.1016/j.cad.2011.09.006
- Gu, P. and Yan, X., 1995, CAD-directed Automatic Assembly Sequence Planning, International Journal of Production Research, 33(11), pp.3069-3100. https://doi.org/10.1080/00207549508904862
- Pan, C., Smith, S.S. and Smith, G.C., 2006, Automatic Assembly Sequence Planning from STEP CAD Files, International Journal of Computer Integrated Manufacturing, 19(8), pp.775-783. https://doi.org/10.1080/09511920500399425
- Zhou, X. and Du, P., 2008, A Model-based Approach to Assembly Sequence Planning, The International Journal of Advanced Manufacturing Technology, 39(9-10), pp.983-994. https://doi.org/10.1007/s00170-007-1272-9
- Vigano, R. and Osorio-Gomez, G., 2011, A Computer Tool to Extract Feasible Assembly Sequences from a Product CAD Model, in Automated Way, Proceedings of International conference on Innovative Methods in Product Design, pp.284-253.
- Mok, S.M., Wu. C.H. and Lee, D.T., 1999, A Hierarchical Workcell Model for Intelligent Assembly and Disassembly, Proceedings 1999 IEEE International Symposium on Computational Intelligence in Robotics and Automation. CIRA'99, pp.125-130.
- Tseng, Y.J., Kao, H.T. and Huang, F.Y., 2010, Integrated Assembly and Disassembly Sequence Planning Using a GA Approach, International Journal of Production Research, 48(20), pp.5991-6013. https://doi.org/10.1080/00207540903229173
- Park, H.S. and Park, J.W., 2013, Development of Assembly Sequence Generating System Based on Parts Liaison Analyzing, Transactions of the Society of CAD/CAM Engineers, 18(1), pp.1-9. https://doi.org/10.7315/CADCAM.2013.1