Abstract
This paper presents a case study of PSD(Platform Screen Door) system assurance based on EN50126 life-cycle stage. By applying this system assurance, the accidents related to urban light transit railway especially that caused casualties could be reduced tremendously. This case study contributes significantly to the reliability, availability, maintainability and safety of the PSD system. Request For Proposal (RFP) of a rail road operator in which required by RAMS is prepared in which to ensure all system assurance activity and safety assessment are compulsory. The step-by-step activities and related deliverables are used which include functional analysis, FMECA, hazard identification analysis, system hazard analysis, maintainability analysis, FRACAS, and finally verification and validation of the system.