References
- Ayob, M. and Kendall, G. (2004), A nozzle selection heuristic to optimise the hybrid pick and place machine, Proceedings of IEEE Conference on Cybernetics and Intelligent Systems, Singapore, 1260-1265.
- Ayob, M. and Kendall, G. (2005), An on-line constructive heuristic to optimise the hybrid pick and place machine, School of CSIT, The University Of Nottingham, Nottingham, UK.
- Ayob, M. and Kendall, G. (2008), A survey of surface mount device placement machine optimisation: machine classification, European Journal of Operational Research, 186(3), 893-914. https://doi.org/10.1016/j.ejor.2007.03.042
- Duman, E. and Or, I. (2004), Precedence constrained TSP arising in printed circuit board assembly, International Journal of Production Research, 42(1), 67-78. https://doi.org/10.1080/00207540310001601073
- Grunow, M., Gunther, H. O., Schleusener, M., and Yilmaz, I. O. (2004), Operations planning for collectand-place machines in PCB assembly, Computers & Industrial Engineering, 47(4), 409-429. https://doi.org/10.1016/j.cie.2004.09.007
- Lee, S. H., Lee, B. H., and Park, T. H. (2000), A hierarchical method to improve the productivity of multihead surface mounting machines, Intelligent Automation and Soft Computing, 6(4), 291-301. https://doi.org/10.1080/10798587.2000.10642797
- Leipala, T. and Nevalainen, O. (1989), Optimization of the movements of a component placement machine, European Journal of Operational Research, 38(2), 167-177. https://doi.org/10.1016/0377-2217(89)90101-X
- Sun, D. S., Lee, T. E., and Kim, K. H. (2005), Component allocation and feeder arrangement for a dualgantry multi-head surface mounting placement tool, International Journal of Production Economics, 95(2), 245-264. https://doi.org/10.1016/j.ijpe.2004.01.003
- Tirpak, T. M. (1993), Simulation software for surface mount assembly, Proceedings of the 25th Conference on Winter Simulation, Los Angeles, CA, 796-803.
- Van Laarhoven, P. J. and Zijm, W. H. M. (1993), Production preparation and numerical control in PCB assembly, International Journal of Flexible Manufacturing Systems, 5(3), 187-207. https://doi.org/10.1007/BF01328741
- Wilhelm, W. E. and Tarmy, P. K. (2003), Circuit card assembly on tandem turret-type placement machines, IIE Transactions, 35(7), 627-645. https://doi.org/10.1080/07408170304357
- Wilhelm, W. E., Arambula, I., and Choudhry, N. N. D. (2006), Optimizing picking operations on dual-head placement machines, IEEE Transactions on Automation Science and Engineering, 3(1), 1-15. https://doi.org/10.1109/TASE.2005.860992