References
- Fuller S. [Internet]. Washington D.C: life-cycle cost analysis(LCCA); 2010 [Updated 2010 Jun 28; cited 2012 Aug 23]. WBDG [1 screen]. Available from: http://www.wbdg.org/resources/lcca.php.
- Rahmen S, Vanier DJ. Life cycle cost analysis as a decision support tool for managing municipal infrastructure. CIB 2004 Triennial Congress. 2004 May;2(1):11-8.
- Dellisola AJ, Kirk SJ. [Internet]. What is life cycle costing?; 2010 [Updated 2010 Mar 3; cited 2012 Sept 12]. REED Construction Data [1 screen]. Available from: http://www.reedconstructiondata.com/rsmeans/articles/what-is-life-cycle-costing.
- Kumar D, Setunge S, Patnaikuni I. Prediction of life-cycle expenditure for different categories of council buildings. Journal of Performance of Constructed Facilities. 2010 Dec;24(6):556-61. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000127
- Kong JS, Frangopol DM. Life cycle reliability-based maintenance cost optimization of deteriorating structures with emphasis on bridges. Journal of Structure Engineering. 2003 Jun;129(6):818-28. https://doi.org/10.1061/(ASCE)0733-9445(2003)129:6(818)
- Tighe S. Guidelines for probabilistic pavement life cycle cost analysis. Transportation research record, 2001 Feb; 179(1):28-35.
- Muga H, Mukherjee A, Mihelcic J. An integrated assessment of the sustainability of green and built-up roofs. Journal of Green Building. 2008 Mar;3(2):106-27. https://doi.org/10.3992/jgb.3.2.106
- Herbold K. Using monte carlo simulation for pavement cost analysis. Public Roads, 2000 Dec;63(3):11-23.
- Norman JL, Smuel K, Balakrishnan N. Probability and mathematical statistics: applied probability and statistics. 2nd ed. New York: John Wiley & Sons; 1994. p. 24-5.
- Limpert E. Stahel W. Abbt M. Log-normal distributions across the sciences: keys and clues. BioScience. 2001 Mar;51(5):341-52. https://doi.org/10.1641/0006-3568(2001)051[0341:LNDATS]2.0.CO;2
- Ridlehoover J. Applying Monte Carlo simulation and risk analysis to the facility location problem. The Engineering Economist. 2004 Dec;49(2):237-52. https://doi.org/10.1080/00137910490498942
Cited by
- Simulation-based costing for early phase life cycle cost analysis: Example application to an environmental remediation project vol.61, pp.3, 2016, https://doi.org/10.1080/0013791X.2015.1062582