References
- Anumba, C., C. Dubler, et al. (2010). The BIM Project Execution Planning Guide and Templates - Version 2.0. University Park, PA, USA, CIC Research Group, Department of Architectural Engineering,The Pennsylvania State University.
- East, E. W. (2012). "Construction Operations Building Information Exchange (COBie)."Retrieved May 7, 2012, from http://www.wbdg.org/resources/cobie.php.
- ISO TC 59/SC 13 (2008). ISO 22263:2008 Organization of information about construction works - Framework for management of project information. Geneva, Switzerland, ISO: 22.
- ISO/TC 59/SC 13 (2010). ISO 29481-1:2010 Building information models - Information delivery manual - Part 1: Methodology and format. Geneva, Switzerland, ISO: 34.
- ISO 29481-1:2010 specifies a methodology and format for the development of an information delivery manual (IDM).
- ISO 29481-1:2010 specifies a methodology that unites the flow of construction processes with the specification of the information required by this flow, a form in which the information should be specified, and an appropriate way to map and describe the information processes within a construction life cycle.
- ISO 29481-1:2010 is intended to facilitate interoperability between software applications used in the construction process, to promote digital collaboration between actors in the construction process and to provide a basis for accurate, reliable, repeatable and high-quality information exchange.
- Lee, G. (2011). "What information can or cannot be exchanged?"Journal of Computing in Civil Engineering 25(1): 1-9. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000062
- NIBS (2011). United States National CAD Standard (NCS) V5. Washington D.C., National Institute of Building Sciences.
- 한국건설기술연구원, (사)한국건설CALS협회. (2004). "건설분야 도면정보 교환표준 Korea Standard of Drawing Information in Construction (KOSDIC)."한국건설기술연구원, 일산, 경기도.