DOI QR코드

DOI QR Code

Relationship of Ceramic Insulation Panel System Development and Verification of LCC

  • Han, Min-Cheol (Department of Architectural Engineering, Cheong-ju University) ;
  • Jeon, Kyu-Nam (Structural Engineering Research Division, Korea Institute of Construction Technology) ;
  • Lee, Gun-Cheol (Department of Waterproofing Repair & Reinforcement, Korea Conformity Laboratories) ;
  • Kim, Tae-Hui (Department of Architectural Engineering, Mokpo National University)
  • 투고 : 2011.12.13
  • 심사 : 2012.05.09
  • 발행 : 2012.08.20

초록

In this study, life cycle cost (LCC) is analyzed according to insulation panel system type using a deterministic LCC analysis method. Through this analysis, it was found that the construction cost in the deterministic LCC analysis for Ceramic panels was low compared to the construction cost for metal and stone panels. Also, the difference in cost between the Ceramic panel and the metal panel was about 2 times. In the area of maintenance cost, it was found to be similar to the previously analyzed construction cost, in which the metal panel has the highest cost due to the high cost of construction and the frequent need for maintenance. In the case of the stone panel, a small difference in cost is shown compared with that of the Ceramic panel, but the cost is higher than the Ceramic panel. Regarding the cost of waste disposal, the Ceramic panel can reduce the cost by at least 1.5 times and up to 2 times compared to other panel systems. Finally, in the analysis of sensitivity according to changes in discount rates, the Ceramic panel and metal panel systems have a similar cost, and the cost of the metal panel is a bit larger than that of other panel systems. Thus, in the subjects used in the analysis, the Ceramic panel system shows the highest economic benefits.

키워드

참고문헌

  1. Lee SR, Jeung NG, Lee KK, Lee SH, Oh MD. Life Cycle Cost Analysis of Energy Saving Performance for Apartment. The Society of Air-conditioning and Refrigeration Engineers of Korea. 2010 October;W(044):254-59.
  2. Kwon SH, Kim SB. A Case Study on the RC Slab Bridge Using LCC Analysis. Korea Institute for Structural Maintenance Inspection. 2007 May;11(3):2-11.
  3. Ministry of Land. Life Cycle Cost Analysis and Evaluation Tips. Gyeonggi-do (Korea): kinmoondang; 2008. 17 p. Korean.
  4. Chung KS, Kim YI, Park DS. Kim SM, Economic Assessment on the Heat Loss of the Heating Pipes by using LCC Analysis in Apartment Complex. Journal of the Architectural Institute of Korea. 2011 June;27(6):275-82.
  5. Lee IG, Kang HW, Won YM, Kim YS. Economic Evaluation for Heating and Cooling System by using Gas Energy and Geothermal Energy Based on LCC Analysis. Journal of the Architectural Institute of Korea. 2011 October;27(10):161-8.
  6. Joe WH, Lim NG. Study on Energy Performance and Economic Evaluation of Windows System with Built-in Type Blinds. Journal of the Korea Institute of Building Construction. 2010 April;10(2):97-104.
  7. Choi OY, Kim TH, Kim GH. A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing. Journal of the Korea Institute of Building Construction. 2008 October;8(5):127-34.
  8. e-CountryIndex Statistics [Internet]. Daejeon: National Statistical Office. 2010-[cited 2011 Dec 14]. Available from: http://www.index.go.kr/egams/index.jsp.
  9. Interest rate of deposits [Internet]. Seoul:The Bank of Korea, 2010-[cited 2011 Dec 14]. Available from: http://www.bok.or.kr/main/korMain.action.
  10. Kim KW, Yun SH. A Case Study of Life Cycle Cost Analysis on Apartment houses and Han-Ok. Journal of the Korea Institute of Building Construction. 2010 December;10(6):1-6.