Abstract

Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to $5^{\circ}C$, which is the design temperature of road snow-melting, after 2 hours' operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ${\pm}0.4^{\circ}C$ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to $5^{\circ}C$ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to $0^{\circ}C$ after 2 hour and 40 minutes, and it does never increase to $5^{\circ}C$. And the roads paved by ascon and brick is maintained as below $0^{\circ}C$ after 12 hours geothermal circulation.

Keywords

References

  1. 황광일, 김중헌, 신승호, 연구.사무용 건물에 적용된 수직형 지열냉난방시스템의 계절별 성능평가, 대한건축학회논문집 계획계, 제25권 제7호, 2009.7.
  2. 황광일, 김중헌, 신승호, 김용식, 건물기초 슬래브에 설치된 수평형 지열교환기 성능의 경년변화, 대한건축학회논문집 계획계, 제23권 제5호, PP.179-186, 2007.5
  3. Thomas H. Durkin, Keith E. Cecil, Geothermal Central System, ASHRAE Journal, pp.42-48, 2007.8
  4. ASHREA Handbook, HVAC Application, Chapter 50, ASHREA, 2007
  5. 황광일, 신동걸, 김중헌, 신승호, 정명관, 복합용도 건물에 적용된 400RT급 수직형 지열시스템의 입주전 성능평가, 한국태양에너지학회 논문집, Vol.28, No.3, 2008. 6.
  6. 신동걸, 지열원 히트펌프 시스템의 운전방식에 따른 시스템 효율 향상 방법 연구, 한국해양대학교 대학원, 2009
  7. Frank P. Incropera, David P. DeWitt, Theodore L. Bergman, Adrienne S. Lavine, Introduction to Heat Transfer, 5th, 2009.
  8. オンサイト型都市融雪システム硏究會, オンサイト型都市融雪システムの實際と計書, 理工圖書, 2000

Cited by

  1. Development of block-type sidewalk pavement system using snow-melting system vol.16, pp.6, 2015, https://doi.org/10.6106/KJCEM.2015.16.6.136
  2. Characteristics comparison of weld metal zones welded to cast and forged steels for piston crown material vol.29, pp.06n07, 2015, https://doi.org/10.1142/S0217984915400497
  3. Performance evaluation of sea water heat exchanger installed in concrete structure of pontoon vol.29, pp.06n07, 2015, https://doi.org/10.1142/S0217984915400126
  4. 질소가 도핑 된 흑연섬유 발열체의 제조 및 발열특성 vol.28, pp.1, 2017, https://doi.org/10.14478/ace.2016.1111
  5. 현장시험을 통한 Carbon fiber heating wire의 콘크리트슬래브 열전달 효과 vol.20, pp.4, 2019, https://doi.org/10.14481/jkges.2019.20.4.31
  6. Deicing Concrete Pavements and Roads with Carbon Nanotubes (CNTs) as Heating Elements vol.13, pp.11, 2020, https://doi.org/10.3390/ma13112504