DOI QR코드

DOI QR Code

Influence of Zero Reading on Predicting Crown Displacement of Tunnel

초기계측 시점이 터널 내공변위 예측에 미치는 영향분석

  • 김광염 (한국건설기술연구원 SOC성능연 구소 Geo-인프라연구실) ;
  • 김호근 (한국건설기술연구원 SOC성능연 구소 Geo-인프라연구실) ;
  • 서용석 (충북대학교 지구환경과학과)
  • Received : 2012.06.19
  • Accepted : 2012.06.27
  • Published : 2012.06.30

Abstract

Deformation behaviour of rock mass around an opening measured during tunnel excavation is very important in order to assess the stability of the tunnel. Unfortunately displacement measured only after the installation of displacement measuring device can be acquired, which results in inevitably excluding the pre-displacement occurred and accumulated before the displacement measuring devices are installed. So it is very important to consider the pre-displacement based on the elapsed time before zero reading after deformation behaviour started. In this study, the accuracy of total estimated displacement depending on the distance between face and measurement position is calculated by statistical non-linear fitting on measurable displacement data. Besides, the influence of the unavoidable measurement error is considered by using Monte-Carlo simulation. As a result, the faster the initial reading started and the smaller the measurement error is, the higher the accuracy of estimating total displacement is obtained.

터널 굴착에 의해 발생되는 주변 지반의 변위는 터널의 안정성 평가를 위해 중요한 정보가 된다. 실제 시공중 계측에 의해 획득되어 지는 변위량은 불가피하게 계측전 발생한 변위를 포함하지 못하게 된다. 따라서, 계측이 이루어진 시점을 고려하여 계측전 발생한 변위량을 예측하는 것은 매우 중요하다. 본 연구에서는 초기 계측이 이루어진 시점에 따라 계측전 변위 예측의 정확도를 굴착면과 계측지점의 이격거리만을 고려하여 통계적 기법으로 고찰하였다. 또한, 계측 오차가 변위 예측결과에 미치는 영향을 몬테카를로 시뮬레이션을 통하여 살펴보았다. 연구결과 초기 계측이 이루어진 이격거리가 커질수록 전체 변위 이력곡선의 예측 정확도는 급격히 감소하였으며, 계측오차가 커질수록 예측 정확도가 낮아지는 경향을 확인하였다.

Keywords

References

  1. Kim, K. Y., 2007, Measurement and analysis of 3-D absolute displacement for prediction of fault zone ahead of tunnel face, Ph.D. Thesis, Seoul National University, Korea.
  2. Kim, C., Chae, Y., Park, Y., 2008, Prediction of preceding displacement of a soil-tunnel by displacement monitoring using horizontal inclinometer, Journal of Korean Society for Rock Mechanics, Vol. 18, No. 5, pp. 355-365.
  3. Kim, C. Y., Bae, G. J., Hong, S. W., Seo, Y. S., Kim, K. Y., Schubert, W., 2003, Interpretation of displacement monitoring results for tunnels in heterogeneous rock mass, Proc. Conference of Korea Society for Rock Mechanics, pp. 81-102.
  4. Kim, C., 2010, Forecasting final displacement with displacement functions using deformation measurements while constructing a tunnel, Journal of Kore Society for Rock Mechanics, Vol. 20, No. 6, pp. 408-420.
  5. Hanafy, E. A. and Emery J. J., 1980, Advancing face simulation of tunnel excavations and lining placement, Proc. 13th Canadians Rock Mechanics Symp., CIMM, Montreal, pp. 119-125.
  6. Hoek, E., Kaiser, P. K. and Bawden, W. F., 1995, Support of underground excavations in hard rock, Balkema, Canberra.
  7. Kaiser, P. K. 1980, Effect of stress-history on the deformation behavior of underground openings, Proc. 13th Canadians Rock Mechanics Symp., CIMM, Montreal, pp. 133-140.
  8. Lombardi, G., 1979, On the choice of rock mechanics tests (in English and French), Proc. 4th Congress International Society for Rock Mechanics, Montreux, Vol. 3, pp. 187-191.
  9. Lunardi, P., 2000, Design and construction of tunnels using the approach based on the analysis of controlled deformation in rocks and soils, Tunnels & Tunnelling, Int. Special Suppl., pp. 3-30.
  10. Panet, M. and Guenot, A., 1982, Analysis of convergence behind the face of a tunnel, Tunnelling 82, Brighton, United Kingdom, pp. 197-204.
  11. Sellner, P., 2000, Prediction of Displacements in Tunnelling, Ph.D. Thesis, Graz University of Technology, Austria.
  12. Sulem, J., Panet, M. and Guenet, A., 1987, An analytical solution for time-dependent displacement in a circular tunnel, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr., Vol. 24, No. 3, pp. 155-164.
  13. Vassilev, V. H. and Hrisstov, T. N., 1988, Influence of the heading face and a two-dimensional calculation model of tunnel linings, Proc. 6th Int. Conf. on Numerical Methods in Geomech., Innsbruck, Vol. 3, pp. 1551-1555.