Abstract
As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.
도심지의 굴착공사 시 굴착심도가 깊어지고 있어 굴착공정에 따른 문제점들을 개선할 수 있는 방안에 대한 연구가 시급한 실정이다. 본 논문은 도심지 굴착공사 시 공사기간을 단축시키면서, 주변 구조물에 미치는 영향을 최소화 할 수 있는 굴착공법에 대한 연구이다. 본 연구의 방법으로 국내 및 국외에서 다수 시공된 벽식 지하연속벽의 공법인 Slurry Wall 공법의 문헌자료를 통해 지하연속벽 시공의 이론적 고찰을 실시하고, 기존 지하연속벽 공법의 트렌치 굴착 시 발생되는 비효율적인 시공단계의 주요한 문제점들을 분석하여 기술요소를 도출하였다. 도출된 기술요소를 반영하여 개선 가능한 새로운 공법을 제시하였고, 제시된 굴착공법을 현장에 적용한 사례를 바탕으로 기존 굴착공법과의 공사기간을 비교 분석하였다. 본 논문에서 제안된 공법을 현장에 적용한 결과, 기존예정공정표에 표시된 48일에서 15일 단축된 33일에 굴착공정을 마칠 수 있었다. 또한, 제안된 공법은 기존 지하연속벽 공법들에 비해 공기단축의 효과는 물론 경제성, 환경성 및 안정성 또한 뛰어난 것으로 기대되며, 향후 지하연속벽 시공의 공기단축에 기여하리라 사료된다.