시공단계 및 온도변화에 따른 공동주택 동바리 하중변화

Load Changes of R/C Apartment under Construction according to Construction Stage and Temperature Changes

  • 오재근 (대림산업(주) 기술개발원 건축연구지원팀)
  • 발행 : 2012.12.15

초록

키워드

참고문헌

  1. American Concrete Institute, "Formwork for Concrete," SP-4, Detroit, Mich.
  2. American Concrete Institute, "Guide to Formwork for Concrete," ACI 347-04, Detroit, Mich.
  3. 한국콘크리트학회, 콘크리트 표준시방서 해설, 2003
  4. Pericles C. Stivaros and Grant T. Halvorsen, "Shoring/Reshoring Operations for Multistory Buildings," ACI Structural Journal, V.87, No.5, September-October 1990, pp.589-596
  5. Rosowsky, D. V., Philbrick Jr., T. W., and Huston, Dryver R., "Observations from Shore Load Measurements during Concrete Construction," Journal of Performance on Constructed Facilities, Vol.11, No.1, February 1997, pp.18-23 https://doi.org/10.1061/(ASCE)0887-3828(1997)11:1(18)
  6. 강수민, 오재근, 김욱종, 이도범, "현장계측을 통한 RC 벽식아파트의 시공 중 하중 및 거동변화 분석," 대한건축학회 논문집, v.25, n.02, 02월 2009년, pp.37-48
  7. 김선영, 김진근, 이수곤, "시공단계를 고려한 동바리 및 기둥의 시간 의존적 축력변화에 관한 연구," 대한건축학회 논문집, v.18, n.12, 12월 2002년, pp.51-58