Risk management applicable to shield TBM tunnel: II. Risk analysis methodology

쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법

  • Received : 2012.11.07
  • Accepted : 2012.11.25
  • Published : 2012.11.30

Abstract

In this paper, a risk analysis methodology applicable to shield TBM tunnels was studied. Fault Tree Analysis (FTA) was utilized to identify all risk items and to calculate the probability of failure of each item and Analytic Hierarchy Process (AHP) was used to obtain the impact of each risk item. Finally, a risk level of each risk item can be assessed. Developed methodology is applied to a Seoul subway site in which EPB shield tunnel method was utilized and it was found that risk analysis results matched reasonably well with field data.

본 논문에서는 쉴드 TBM 터널에서 적용 가능한 리스크 분석 방법을 연구하였다. FTA 방법을 통해 리스크 아이템과 각각의 발생확률을 확인하고 AHP 방법을 통해 각각의 리스크 아이템의 영향도를 구하였다. 마지막으로 각각의 리스크 아이템의 리스크 레벨을 평가할 수 있었다. 개발된 방법을 EPB 쉴드 터널이 사용된 서울 지하철 현장에 적용하여 리스크 분석 결과가 현장 데이터에 부합하는 합리적 결과임을 검증하였다.

Keywords

References

  1. Hong, E.S., Kong, J.S., Shin, H.S., Lee, I.M., (2007), "A Case Study for Probabilistic Risk Evaluation based on Event Tree Analysis Technique for the Design of Shield TBM", Journal of Korean Society of Civil Engineers, Vol. 27, No. 2, pp. 139-147.
  2. Kim, K.J., Jang, M.S. (2006), "The method of results of decision reflections between PI project valuation groups using AHP", Jounal of Korean Society of Road Engineers, Vol. 8, No. 4, pp. 145-157.
  3. Korean Tunnelling Association (2008), Series of Tunnel Engineering 3 - Tunnel Mechanized Construction Design, CIR, Seoul. pp. 3-6.
  4. Ku, B.H., Cha, J.M., Kim, H.C. (2008), "Reliability analysis of distribution systems by using FTA", The Korean Institute of Electrical Engineers power engineering autumnal conference, pp. 247-249.
  5. Lee, H.C., Kim, S.K., Kim, O.K. (2007), "Development of decision making model for selecting the soft foundation improvement method using AHP technique", Journal of Korean Society of Civil Engineers, Vol. 27, No. 4, pp. 499-506.
  6. Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.

Cited by

  1. TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application vol.18, pp.1, 2016, https://doi.org/10.9711/KTAJ.2016.18.1.001
  2. Analysis of inner parts in the disc cutters applied to the field tests vol.17, pp.4, 2015, https://doi.org/10.9711/KTAJ.2015.17.4.473