Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Received : 2012.08.22
  • Accepted : 2012.11.16
  • Published : 2012.12.01

Abstract

The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Keywords

References

  1. J.O. Okumbe, J.J. Verste, "Construction industry perspective on causes and effects of delays in South Africa", Proceedings of the construction and building research conference of the Royal Institution of Chartered Surveyors held at Dublin Institute of Technology, pp. 4-5, September 2008.
  2. S.M. Ahmed, S. Azhar, M. Castillo, P. Kappagantula, "Construction delays in Florida: An empirical study", Department of Community Affairs, Florida, 2000.
  3. Y.W. Soon, M. Sambasivan, "Causes and effects of delays in Malaysian construction industry",International Journal of Project Management, vol. 25, no. 5, pp.517-526, 2007. https://doi.org/10.1016/j.ijproman.2006.11.007
  4. H.M. Al-Humaidia, H.F. Tanb, "A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models", Civil Engineering and Environmental Systems, vol. 27, no. 4, pp. 329-351, 2010. https://doi.org/10.1080/10286600903150721
  5. J.B. Yang, P.R. Wei, "Causes of delay in the planning and design phases for construction projects", Journal of Architectural Engineering, vol. 16, no. 2, pp. 80-83, 2010. https://doi.org/10.1061/(ASCE)1076-0431(2010)16:2(80)
  6. J.B. Yang, S.F. Ou, "Using structural equation modeling to analyze relationships among key causes of delay in construction", Canadian Journal of Civil Engineers, vol. 35, no. 4, pp. 321-332, 2008. https://doi.org/10.1139/L07-101
  7. A. Enshassi, J. Al-Najjar, M. Kumaraswamy, "Delays and cost overruns in the construction projects in the Gaza Strip", Journal of Financial Management of Property and Construction, vol. 14, no. 2, pp. 126-151, 2009. https://doi.org/10.1108/13664380910977592
  8. S. Scott, "The nature and effects of construction delays", Construction Management and Economics, vol. 11, no. 5, pp. 358-369, 1993. https://doi.org/10.1080/01446199300000040
  9. J.U. Ezeokonkwo, "Disruption in construction project: Effects on project cost and quality", in Workshop on the effective building procurement and delivery in the Nigerian construction industry, Eds. M.E.Obiegbu, J.U.Ezemerihe, S.Akabogu, 1995.
  10. D.C. Okpala, A.N. Aniekwu, "Causes of high costs of construction in Nigeria", Journal of Construction Engineering and Management, vol. 114, no. 2, pp. 233-244, 1988. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:2(233)
  11. N.R. Mansfield, O. Ugwu, T. Doran, "Causes of delay and cost overruns in Nigerian construction projects", International Journal of Project Management, vol. 12, no. 4, pp. 254-260, 1994. https://doi.org/10.1016/0263-7863(94)90050-7
  12. C. Semple, F.T. Hartman, G. Jergeas, "Construction claims and disputes: Causes and cost/time overruns", Journal of Construction Engineering and Management, vol. 120, no. 4, pp. 785-795, 1994. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785)
  13. S.A. Assaf, M. Al-Khalim, M. Al-Hazmi, "Causes of delay in large building construction project", Journal of Management in Engineering, vol. 11, no. 2, pp. 45-50, 1995. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45)
  14. D.M. Chan, M.M. Kumaraswamy, "Reasons for delay in civil engineering projects: The case of Hong Kong", Hong Kong Institute of Engineering and Transport, vol. 2, no. 3, pp. 1-8, 1996.
  15. S.O. Ogunlana, K. Promkuntong, "Construction delay in fast-growing economy: comparing Thailand with other economies", International Journal of Project Management, vol. 14m no. 1, pp. 37-45, 1996.
  16. H.A. Odeyinka, A. Yusif, "The causes and effects of construction delays on completion cost of housing projects in Nigeria", Journal of Financial Management of Property and Construction, vol. 2, no. 3, pp. 31-44, 1997.
  17. T.M. Mezher, W. Tawil, "Causes of delay in the construction industry in Lebanon", Engineering, Construction and Architectural Management, vol. 5, no. 3, pp. 252- 260, 1998. https://doi.org/10.1108/eb021079
  18. A.H. Al-Momani, "Construction delay: a qualitative analysis", International Journal of Project Management, vol. 18, no. 1, pp. 51-59, 2000. https://doi.org/10.1016/S0263-7863(98)00060-X
  19. T.Y. Lo, I.W. Fung, K.C. Tung, "Construction delays in Hong Kong civil engineering projects",Journal of Construction Engineering and Management, vol. 132, no. 6, pp. 636-649, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)
  20. M. Haseeb, Xinhai-Lu, A. Bibi, Maloof-ud-Dyian, W. Rabbani, "Problem of projects and effects of delays in the construction industry of Pakistan", Australian Journal of Business and Management Research, vol. 1, no. 5, pp. 41-50, 2011.
  21. A.A. Aibinu, G.O. Jagboro, "The effects of construction delays on project delivery in the Nigerian construction industry", International Journal of Project Management, vol. 20, no. 8, pp.593-599, 2002. https://doi.org/10.1016/S0263-7863(02)00028-5
  22. P. Kaming, P. Olomolaiye, G. Holt, F. Harris, "Factors influencing construction time and cost overruns on high-rise projects in Indonesia", Construction Management and Economics, vol. 15, no. 1, pp. 83-94, 1997. https://doi.org/10.1080/014461997373132
  23. H. Li, P.E.D. Love, D.S. Dawe, "Effects of overtime work and additional resources on project cost and quality", Engineering Construction and Architectural Management, vol. 7, no. 3, pp. 211-220, 2000. https://doi.org/10.1108/eb021146
  24. O. Motaleb, M. Kishk, "An investigation into causes and effects of construction delays in UAE" Proceedings of 26th Annual ARCOM Conference, Leeds, UK, pp. 1149-1157, 2010.
  25. W. Alaghbari, M.A. Kadir, A. Salim, Ernawati, "The significant factors causing delay of building construction projects in Malaysia", Engineering, Construction and Architectural Management, vol. 14, no. 2, pp. 192-206, 2007. https://doi.org/10.1108/09699980710731308

Cited by

  1. Delay factor analysis for hospital projects in Vietnam vol.20, pp.2, 2016, https://doi.org/10.1007/s12205-015-0316-1
  2. Proposing a neural network model to predict time and cost claims in construction projects vol.22, pp.7, 2016, https://doi.org/10.3846/13923730.2016.1205510
  3. The top 10 universal delay factors in construction projects vol.11, pp.3, 2018, https://doi.org/10.1108/IJMPB-05-2017-0052
  4. Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa vol.18, pp.1, 2018, https://doi.org/10.4102/ac.v18i1.528