References
- Framinan, J.M. and R. Leisten, "Availableto-promise (ATP) systems:a classification and framework for analysis," International Journal of Production Research, Vol.48, No.11 (2009), pp.3079-3103.
- Keskinocak, P. and S. Tayur, "Due-Date Management Policies, in Handbook of Quantitative Supply Chain Analysis:Modeling in the E-Business Era, Norwell," MA:Kluwer Academic Publishers, (2004), pp.485-553.
- Kaminsky, P. and D. Hochbaum, "Due-date quotation models and algorithms," Handbook of scheduling:Algorithms, models, and performance analysis, Boca Raton:CRC Press Inc., 2004.
- Gordon, V., J.M. Proth, and C. Chu, "A survey of the state-of-the-art of common duedate assignment and scheduling research," European Journal of Operational Research, Vol.139, No.1(2002), pp.1-25. https://doi.org/10.1016/S0377-2217(01)00181-3
- Cheng, T.C.E. and M.C. Gupta, "Survey of scheduling research involving due-date determination decisions," European Journal of Operational Research, Vol.38, No.2(1989), pp. 156-166. https://doi.org/10.1016/0377-2217(89)90100-8
- Lee, G.C., "Estimating order lead times in hybrid flowshops with different scheduling rules," Computers and Industrial Engineering, Vol.56, No.4(2009), pp.1668-1674. https://doi.org/10.1016/j.cie.2008.10.016
- Sha, D.T. and S.Y. Hsu, "Due-date assignment in wafer fabrication using artificial neural networks," International Journal of Advanced Manufacturing Technology, Vol.23, No.9/10(2004), pp.768-775. https://doi.org/10.1007/s00170-003-1644-8
- Lawrence, S.R., "Estimating flowtimes and setting due-dates in complex production systems," IIE Transactions, Vol.27, No.5(1995), pp.657-668. https://doi.org/10.1080/07408179508936781
- Moses, S., H. Grant, L. Gruenwald, and P. Pulat, "Real-time due-date promising by build-to-order environments," International Journal of Production Research, Vol.42, No. 20(2004), pp.4353-4375. https://doi.org/10.1080/00207540410001716462
- Vig, M.M. and K.J. Dooley, "Mixing static and dynamic flowtime estimates for due-date assignment," Journal of Operations Management, Vol.11, No.1(1993), pp.67-79. https://doi.org/10.1016/0272-6963(93)90034-M