Constructed Wetland Design Method to Treat Agricultural Drainage from Tidal Reclaimed Paddy Areas
간척지 논 농업배수 처리에 적합한 인공습지 설계 기법
- Published : 2011.06.30
Abstract
The standard design methodology was suggested to construct wetland system for reducing non-point source pollution from Saemangeum reclaimed paddy land. To set for the design flow and concentrations, runoff and water quality survey were conducted during the irrigation period in 2008 at Gyehwa reclaimed paddy land located at near Saemangeum lake. It is rational that 1ha is the optimum constructed wetland size. To meet this size, the moderate drainage area of reclaimed paddy field was 50ha under the conditions that rainfall is 30mm, average runoff coefficient is 0.83, and runoff capture ratio is 0.6. At these condition, the runoff volume from 50ha was 10,520