DOI QR코드

DOI QR Code

A Daily Scheduling of Generator Maintenance using Fuzzy Set Theory combined with Genetic Algorithm

퍼지 집합이론과 유전알고리즘을 이용한 일간 발전기 보수유지계획의 수립

  • Received : 2011.05.12
  • Accepted : 2011.06.08
  • Published : 2011.07.01

Abstract

The maintenance of generating units is implicitly related with power system reliability and has a tremendous bearing on the operation of the power system. A technique using a fuzzy search method which is based on fuzzy multi-criteria function has been proposed for GMS (generator maintenance scheduling) in order to consider multi-objective function. In this study, a new technique using combined fuzzy set theory and genetic algorithm(GA) is proposed for generator maintenance scheduling. The genetic algorithm(GA) is expected to make up for that fuzzy search method might search the local solution. The effectiveness of the proposed approach is demonstrated by the simulation results on a practical size test systems.

Keywords

References

  1. 宋吉永, 電力系統의 解析 및 運用, 동일출판사, pp.11-43, pp.344-416, 1986.
  2. Roy Billinton, Reliability Assessment of Large Electric Power Systems, pp.1-24, Kluwer Academic Publishers, 1988.
  3. X. Wang, J.R. McDonald, 1994, Modern Power System Planning, McGraw-Hill Book Company, pp.247-307, 1994.
  4. 이봉용, 심건보, 한계보수비용 및 위험지수 평준화법에 의한 최적전원보수계획의 비교, 대한전기학회 논문지, 1월, Vol.41, No.1, pp.9-17, 1992.
  5. 최재석, 송길영, 발전기보수유지계획에 관한 연구, 대한전기학회 하계학술대회 논문집, pp.148-151, 1985.
  6. 최재석, 이순영, 신흥교, 퍼지탐색법을 이용한 발전기보 수유지계획의 수립, 자동화 및 컴퓨터응용기술 논문지, Vol.2, No.1, pp.67-73, 1995.
  7. 崔在錫, 都大鎬, 李泰仁, 퍼지 多目的函數를 이용한 發電機補修維持計劃의 樹立, 한국퍼지 및 지능 시스템학회 추계학술발표대회 논문집, pp.131-138, 1995.
  8. 최재석, 도대호, 퍼지 정수계획법을 이용한 발전기 보수유지계획 수립 수법의 개발, 한국퍼지 및 지능 시스템학회 논문지, Vol.7, No.5, pp.77-85, 1997.
  9. 문승필, 도대호, 최재석, 이순영, 신흥교, 김상현, 김용신, 김홍식, 大氣 汚染을 고려한 發電機 補修維持計劃의 樹立, 자동화 및 컴퓨터응용기술 논문지, Vol.5, No.1, 1998.
  10. 김홍식, 문승필, 최재석, 퍼지이론을 이용한 유연한 발전기보수유지계획 수립에 관한 연구, 대한전기학회 하계학술대회 논문집, pp.1104-1107, 1999.
  11. Jeongje Park, Jaeseok Choi, Ungki Baek, Junmin Cha, Maintenance Scheduling of Generation System by Fuzzy Set Theory, 대한전기학회 하계학술대회 논문집, pp.127-128.
  12. A Study on the Balanced Generators Maintenance Scheduling of Generation Compaies, 대한전기학회 전력기술부문회 추계학술대회 논문집, pp.61-63, 2009.
  13. Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System, 대한전기학회 논문지, Vol.5, No.1, pp.8-15, 2010.
  14. Jaeseok Choi, Jeongje Park, Ungki Baek, Bonhui Ku and Junmin Cha, "Generators Maintenance Scheduling of Generation Companies in Korea Considering Uncertainties", PMAPS2010, Grand Copthorne Waterfront Hotel, Singapore, June 14-17, 2010.
  15. 최재석, 박정제, Fuzzy GA를 이용한 발전기 보수유지 계획의 수립, 2009년도 대한전기학회 전력기술부문회 추계학술대회 논문집, pp.58-60, 2009.
  16. Taegon Oh, Jeongje Park, Kyeonghee Cho, Jaeseok Choi, Ungki Baek and A.A. El-Keib, "Generators Maintenance Scheduling using combined Fuzzy Set Theory and GA", International Conference on Electrical Engineering 2010, paradise hotel, Busan, Korea, July 11-14, 2010.
  17. H. J. Zimmermann, Fuzzy Set Theory and Its Applications, Kluwer-Nijhoff Publishing, pp.220-234, 1986.
  18. John H. Holland, Adaptation in Natural and Artificial Systems, The MIT Press, 1992.
  19. Yong-Hua Song, Allan Johns and Raj Aggarwal, Computational Intelligence Applications to Power Systems, Kluwer Academic Publishers, pp.128-133, 1996.