The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

현재 국내 건설 산업은 고층화, 대형화 되어감에 따라 새로운 기술 개발로 비약적인 발전과 함께 품질향상을 위해 품질관리기법 및 품질관리제도 개선을 하고 있지만, 기술개발에 비해 건축물의 품질향상수준은 미흡한 수준이다. 반면에, 사용자의 의식변화로 건설품질에 대한 관심이 증가됨에 따라 요구품질수준이 높아지고 있다. 정부에서는 책임감리제도의 시행 및 해외업체의 국내 감리업무진출 허용 등의 품질제도를 강화하였고 및 민간부문에서도 사전자격심사제도의 시행 및 ISO 9000시리즈의 품질보증 등을 통한 품질 향상을 꾀하고 있지만, 현행 건설공사는 설계, 재료, 공법 등이 이미 확정된 발주자의 공사 시방서에 의한 공사를 수행함에 따라 정해진 사항의 이행 여부만을 판단할 뿐 수급자의 품질 개선을 위한 기술 개발의 필요성 및 기회를 제공하지 못하고 있다. 따라서 본 연구에서는 건설 공사단계에서 수급자가 자발적으로 품질확보를 할 수 있는 지불규정제도의 업무프로세스와 제도개선 방안을 제시하였다.

Keywords

References

  1. Kim DG, Lee SB. [A Study on the Delivery Process of the Warranty Contract in Domestic Private Participation in Infrastructure]. Journal of the regional association of architectural institute of korea. 2008 Mar;10(1):231-8. Korean.
  2. Lee SB. [Adjustment of Contract Price according to Introduction of Pay Adjustment]. Journal of the korea institute of building construction 2010 Feb;10(1):175-80. Korean. https://doi.org/10.5345/JKIC.2010.10.1.175
  3. Construction Technology Control Act. In: Quality Managemen of Construction, Art.24.(KR). The Ministry of Land(KR); 2010. 22 p. Korean.
  4. Park YC. A Study on the Scheme Activating Construction Quality Management System based on ISO 9000s [master's thesis]. Seoul(Korea): Chung-Ang University; 2008. 180 p. Korean.
  5. Bang HY. A Study on the Improved Quality Management System for Quality Assurance on Construction Site [master's thesis]. Gyengnam (Korea): Gyeongsang National University; 2010. 57 p. Korean.
  6. Construction Technology Control Act Enforcement Decree, Art.3, Section2.(KR): The Ministry of Land(KR); 2011. 41 p. Korean.
  7. Seo YC. (Korea Institute of construction & Transportation Technology Evaluation and Planning, Gunwon ENG), The Standardization of the construction Standard focused on the Performance. Seoul (Korea): The Ministry of Land(KR); 2009 May. 70 p. Report NO.: Leave. Korean.

Cited by

  1. Weighing the CS Experts' Priority on the Quality of Each Housing Segment - Focused on Apartment Building Construction Projects - vol.11, pp.6, 2011, https://doi.org/10.5345/JKIBC.2011.11.6.609