References
- 최병규, (2009), 반도체/LCD 산업의 시뮬레이션 기반 생산운영 시스템, 대한산업공학회/한국경영과학회 춘계학술대회.
- Akcali, E., Uzsoy, R. "A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography," Electronics Manufacturing Technology Symposium (Twenty-Sixth IEEE/CPMT International), 374-381. 2000.
- Chand, S., Traub, R., and Uzsoy, R. Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates, Annals of Operations Research, 70, 115-125. 1997. https://doi.org/10.1023/A:1018961818782
- Chung, J., and Jang, J. The WIP Balancing Procedure Increasing Throughput for Semiconductor Fabrication, IEEE Transactions on Semiconductor Manufacturing, 22(3), 381-390. 2009. https://doi.org/10.1109/TSM.2009.2017666
- Dabbas, R. M. and Fowler, J. W. A new scheduling approach using combined dispatching criteria in wafer fabs, IEEE Transactions on Semiconductor Manufacturing, 16(3), 501-510. 2003. https://doi.org/10.1109/TSM.2003.815201
- Fowler, J. W., Phojanamongkolkij, N., Cochran, J. K., and Montgomery, D. C., Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batch processing. International Journal of Production Research, 40(2), 275-292. 2002. https://doi.org/10.1080/00207540110081489
- Jang, J., Suh, J., and Ferreira, P. An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Production Research, 39(17), 3901-3921. 2001. https://doi.org/10.1080/00207540110056261
- Koo, P.-H, Jang, J. and Suh, J. Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first, International Journal of Flexible Manufacturing Systems, 17(1), 23-38. 2005. https://doi.org/10.1007/s10696-005-5992-6
- Lou, S. X. C. and Kager, P. W. A Robust production control policy for VLSI wafer fabrication. IEEE Transactions on semiconductor manufacturing, 2(4), 159-164. 1989. https://doi.org/10.1109/66.44620
- Lu, S. C. H., Ramaswamy, D., and Kumar, P. R. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants, IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388. 1994. https://doi.org/10.1109/66.311341
- Pai, P. F., Lee, C. E. and Su, T. H. A daily production model for wafer fabrication. International journal of advanced manufacturing technology, 23, 58-63. 2004. https://doi.org/10.1007/s00170-002-1506-9
- Shen, Y. and Leachman, R.C. "Stochastic wafer fabrication scheduling," IEEE transactions on semiconductor manufacturing, 16(1), 2-14. 2003. https://doi.org/10.1109/TSM.2002.807743
- Suh, J., Jang, J., and Koo, P. H. Development of a Look-ahead AGV controller for a clean bay operation, International Journal of Industrial Engineering, 10(4), 547-554. 2003.
- Trappey, A. J., Lin, G. Y., Ku, C. C. Design and analysis of a rule-based knowledge system supporting intelligent dispatching and its application in the TFT-LCD industry, International Journal of Advanced Manufacturing Technology, 35, 385-393. 2007. https://doi.org/10.1007/s00170-007-1177-7
- Uzsoy, R., Lee, C., and Martin-Vega, L.A. A review of production planning and scheduling models in the semiconductor industry part II: shop-floor control, IIE transactions, 26(5), 44-55. 1994. https://doi.org/10.1080/07408179408966627