DOI QR코드

DOI QR Code

수리가능한 품목의 예방교체를 위한 주문정책

A Spare Ordering Policy for Preventive Replacement with Repair

  • 임성욱 (대진대학교 산업경영공학과) ;
  • 박영택 (성균관대학교 시스템경영영공학과)
  • 투고 : 2011.09.16
  • 심사 : 2011.11.17
  • 발행 : 2011.12.31

초록

This paper presents a spare ordering policy for preventive replacement with minimal repair. To analyze the ordering policy, the failure process is modeled by a non-homogeneous Poisson process. Introducing the ordering, repair, downtime, replacement costs and salvage value, we derive the expected cost effectiveness as a criterion of optimality when the lifetime and lead times for the regular and expedited orders are generally distributed random variables. It is shown that, under certain conditions, there exists a finite and unique optimum ordering time which maximizes the expected cost effectiveness. A numerical example is also included to explain the proposed model.

키워드

참고문헌

  1. Barlow, R.E. and Hunter, L.,(1960) "Optimum preventive maintenance policies," Operations Research, Vol. 8, pp. 90-100. https://doi.org/10.1287/opre.8.1.90
  2. Chien, Y.H.,(2005) "Generalized spare ordering policies with allowable inventory time," International Journal of Systems Science, Vol. 20, pp. 823-832.
  3. Cleroux, R., Dubuc, S. and Tilquin, C.,(1979) "The age replacement problem with minimal repair and random repair cost," Operations Research, Vol. 27, pp. 1158-1167. https://doi.org/10.1287/opre.27.6.1158
  4. Dohi, T., Kaio N. and Osaki S.,(1998) "On the optimal ordering policies in maintenance theory - survey and applications," Applied Stochastic Models and Data Analysis, Vol. 14, pp. 309-321. https://doi.org/10.1002/(SICI)1099-0747(199812)14:4<309::AID-ASM351>3.0.CO;2-R
  5. Hadley, G. and Whitin, T.M.,(1963) Analysis of Inventory Systems, (PrenticeHall : EnglewoodCliffs, N.J.).
  6. Kaio, N. and Osaki, S.,(1978a) "Ordering policies with two types of lead times," Microelectronics and Reliability, Vol. 16, pp. 225-229.
  7. Kaio, N. and Osaki, S.,(1978b) "Optimum planned maintenance with salvage cost," International Journal of Production Research, Vol. 16, No. 3, pp. 249-257. https://doi.org/10.1080/00207547808930017
  8. Kalpakam, S. and Hameed, A.S.,(1981) "Ordering policies with random lead times," Microelectronics and Reliability, Vol. 21, No. 5, pp. 737-741. https://doi.org/10.1016/0026-2714(81)90067-6
  9. Nakagawa, T. and Kowada, M.,(1983) "Analysis of a system with minimal repair and its application to replacement theory," European Journal of Operational Research, Vol. 12, pp. 176-182. https://doi.org/10.1016/0377-2217(83)90221-7
  10. Osaki, S.,(1977) "An ordering policy with lead time," International Journal of Systems Science, Vol. 8, pp. 1091-1095. https://doi.org/10.1080/00207727708942104
  11. Park, Y.T. and Park, K.S.,(1986) "Generalized spare ordering policies with random lead time," European Journal of Operational Research, Vol. 23, pp. 320-330. https://doi.org/10.1016/0377-2217(86)90298-5
  12. Savits, T.H.,(1988) "Some multivariate distributions derived from a nonfatal shock model," Journal of Applied Probability, Vol. 25, pp. 383-390. https://doi.org/10.2307/3214446
  13. Thomas, L.C. and Osaki, S.,(1978) "An optimal ordering policy for a spare unit with lead time," European Journal of Operational Research, Vol. 2, pp. 409-419. https://doi.org/10.1016/0377-2217(78)90136-4
  14. Wang, H.,(2002) "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Vol. 139, pp. 469-489. https://doi.org/10.1016/S0377-2217(01)00197-7