References
- D.R. Anderson, D.J. Sweeney, T.A. Williams, K. Martin (2011) An Introduction to Management Science: Quantitative Approaches to Decision Making 13th ed., Canada: South-Western Cengage Learning.
- A.M. Bahurmoz (2003) "The Analytic Hierarchy Process at Dar Al-Hekma, Saudi Arabia," Interfaces, 33(4), pp. 70-78. https://doi.org/10.1287/inte.33.4.70.16374
- W.D. Cook, J. Zhu (2008) "CAR-DEA: Context-Dependent Assurance Regions in DEA," Operations Research, 56(1), pp. 69-78. https://doi.org/10.1287/opre.1070.0500
- G. Koksal, B. Nalcaci (2006) "The Relative Efficiency of Departments at a Turkish Engineering College: A Data Envelopment Analysis," Higher Education, 51(2), pp. 173-189. https://doi.org/10.1007/s10734-004-6380-y
- S.-T. Liu (2008) "A fuzzy DEA/AR approach to the selection of flexible manufacturing systems," Computers & Industrial Engineering, 54(1), pp. 66-76. https://doi.org/10.1016/j.cie.2007.06.035
- Y.G. Park, S.K. Suh, J.Y. Choi (2008) "Logicality Estimate for Domestic the Periodic Replacement Criteria of CWR based on Accumulated Passing Tonnage," Journal of the Korean Society for Railway, 11(3), pp. 326-333.
- Y.G. Park, D.Y. Sung, H.K. Park, S.Y. Kong (2008) "Bending Fatigue Life Assessment of Aged CWR using the Field Test," Journal of the Korean Society for Railway, 11(3), pp. 317-325.
- T.L. Saaty (1977) "A Scaling Method for Priorities in Hierarchy Structures," Journal of Mathematical Psychology, 15(3), pp. 234-281. https://doi.org/10.1016/0022-2496(77)90033-5
- S. Sasmal, K. Ramanjaneyulu (2008) "Condition Evaluation of Existing Reinforced Concrete Bridges using Fuzzy based Analytic Hierarchy Approach," Expert Systems with Applications, 35(3), pp. 1430-1443. https://doi.org/10.1016/j.eswa.2007.08.017
- T. Sato, A. Sutoh, H. Nishi, H. Arai (2011) "Identification of Correlation between Demand Performances to Damage of Lining Concrete for Tunnel Management," Procedia Engineering, 14, pp. 529-534. https://doi.org/10.1016/j.proeng.2011.07.066
- T.L. Saaty (1980) The Analytic Hierarchy Process, New York: McGraw-Hill.
- S.F. Weber (1993) "A Modified Analytic Hierarchy Process for Automated Manufacturing Decisions," Interfaces, 23(4), pp. 75-84. https://doi.org/10.1287/inte.23.4.75
Cited by
- Estimation of Line Utilization Rate and Track Maintenance Time of Conventional Railway vol.15, pp.6, 2012, https://doi.org/10.7782/JKSR.2012.15.6.638
- An Application of AHP for the Selection of Optimum Product of BWTS for over 10,000 TEU Container Ship vol.52, pp.5, 2015, https://doi.org/10.3744/SNAK.2015.52.5.395
- Probabilistic evaluation of the railway track infrastructure components failure risk vol.230, pp.2261-236X, 2018, https://doi.org/10.1051/matecconf/201823001017