Limiting the Number of Open Projects to Shorten the NPD Schedule

  • Wang, Miao-Ling (Minghsin University of Science and Technology Department of Industrial Engineering and Management) ;
  • Yang, Chun-I (AboCom Systems, Inc.) ;
  • Chang, Sheng-Hung (Minghsin University of Science and Technology Department of Industrial Engineering and Management)
  • Received : 2011.01.19
  • Accepted : 2011.02.21
  • Published : 2011.03.01

Abstract

Many companies open multiple projects simultaneously due to market trends, which results in a crowding out effect because of limited resources. R&D engineers become overloaded and scheduling of product development is delayed resulting in timing misses and lost sales leads. The company in this case study (Company A), often opens up many projects simultaneously in order to respond to market needs quickly. The engineers are overloaded and, of course, the schedule is delayed. In order to identify problems, Company A began using Dr. Goldratt's Thinking Processes (TP) during new product development (NPD). When the analysis phase of TP was completed, Company A's core problem was identified as "the quantity of kick-off projects." Consequently, new rules and conditions and procedures were proposed for the opening, suspending, stopping, and closing of projects. Finally, the "Future Reality Tree" ensured that the proposed rules, conditions and procedures were set up as an available solution approved for practical application by executives. After a one-year trial run, the results showed that the Project Duration Rate was reduced by 53%, the Project Closed Rate was increased by 140% and the Project on Time Rate was increased from 10% to 68%. The above results give significant evidence of the benefits of the proposed methodology.

Keywords

References

  1. Anavi-Isakow, S. and Golany, B. (2003), Managing multiproject environments through constant work-inpro-cess, International Journal of Project Management, 21, 9-18. https://doi.org/10.1016/S0263-7863(01)00058-8
  2. Drucker, P. F., (1954), The Practice of management, Harper and Row Publishers Inc. New York.
  3. Goldratt, E. M. (1994), It's Not Luck. Gower, England.
  4. Kim, S., Mabin, V. J., and Davies, J. (2008), The theory of constraints thinking processes: retrospect and prospect, International Journal of Operations and Production Management, 28, 155-184. https://doi.org/10.1108/01443570810846883
  5. Li, R. K. and Chang, S. H. (2005) Theory of Constraints-from limited to unlimited. The China Productivity Center Taiwan ROC.
  6. Reid, R. A. and Shoemaker, T. E. (2006) Using the Theory of Constraints to focus organizational improvement efforts: Part 1-Defining the problem, Journal of American Water Works Association, 98, 63-75.
  7. Sambasivan, M. and Soon, Y. W. (2007) Causes and effects of delays in Malaysian construction industry, International Journal of Project Management, 25, 517-526. https://doi.org/10.1016/j.ijproman.2006.11.007
  8. Walker II, E. D. and Cox III, J. F. (2006) Addressing illstructured problems using Goldratt's thinking processes: A white collar example processes, Management Decision, 44, 137-154. https://doi.org/10.1108/00251740610641517