As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.

최근 국내외에서 건축물의 고층화 및 비정형화 추세 속에서 BIM기술이 활발히 이루어지고 있으나 설계단계의 BIM 데이터가 시공현장에 적극적으로 재활용되지는 못하고 있다. 건설 회사들의 주요 관심사는 공정 및 공사비 관리 등 여러 분야인데 BIM기술이 활발히 사용되기 위해서는 BIM 데이터가 이러한 용도로 활용될 수 있도록 올바르게 작성되어야 한다. 이를 위해서는 특히 BIM데이터를 건물 부재별로 수량을 올바르게 산출할 수 있도록 기준을 설정하여 BIM데이터를 작성하는 것이 필요하며 작성된 BIM데이터가 올바르게 만들어졌는지를 품질관리 차원에서 확인하는 것이 필요하다. 본 연구는 BIM기술이 건설현정의 공정 및 공사비 관리에 활용에 매우 중요한 물량산출을 올바르게 할 수 있도록 BIM데이터의 품질을 확보할 방안에 대한 제시를 목적으로 수행되었다.

Keywords

References

  1. Kim SH, Yoon SW, Chin SY, Kim TY. A Development of Automated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off. Journal of the Architectural Institute of Korea 2009;25(9):133-143.
  2. Joo SI, Jun HJ. A Study on the BIM-based Material Take Off That is Usable as 4D Simulation. Journal of the Architectural Institute of Korea 2009;29(1):335-338.
  3. Kim BM, Jeong HJ, Jang SJ, Yun SH, Paek JH. A Study on the Improving Effectiveness of Quantity Estimation with BIM. Journal of the Architectural Institute of Korea 2008;28(1):705-708.
  4. Lee DK, Cha HS. Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project. Korean Journal of Construction Engineering and Management 2010;11(5):53-65. https://doi.org/10.6106/KJCEM.2010.11.5.53
  5. Kwon OB, Son JH, Lee SH. Study on the Application of 3D based BIM for School Facilities to Increase Cost Management Efficiency. Journal of Korea Institute of Building Construction. 2010;10(6):49-51. https://doi.org/10.5345/JKIC.2010.12.6.049
  6. MLTM(The Ministry of Land, Transport and Maritime Affairs). BIM Guides for Architectural Field, Seoul: buildingSMART KOREA; 2010.
  7. VTT, BIM Requirements 2007 Volume 7: Quantity take-off. Finland; Helsinki: Senate Properties; 2007.
  8. Editorilal Department. Estimates for Architectural Standards, Seoul: Korea Institute of Construction; 2007

Cited by

  1. Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project vol.15, pp.2, 2014, https://doi.org/10.6106/KJCEM.2014.15.2.053
  2. An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object vol.4, pp.4, 2014, https://doi.org/10.13161/kibim.2014.4.4.013
  3. Analysis of the First Polish BIM-Based Cost Estimation Application vol.123, 2015, https://doi.org/10.1016/j.proeng.2015.10.064
  4. Ontological inference of work item based on BIM data vol.19, pp.3, 2015, https://doi.org/10.1007/s12205-013-0739-5
  5. BIM and ontology-based approach for building cost estimation vol.41, 2014, https://doi.org/10.1016/j.autcon.2013.10.020
  6. Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction vol.14, pp.10, 2013, https://doi.org/10.5762/KAIS.2013.14.10.5184
  7. A Verification of the Accuracy in BIM-Based Quantity Taking-Off - Focusing on Finishing Work vol.3, pp.2, 2013, https://doi.org/10.13161/kibim.2013.3.2.001
  8. A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation vol.17, pp.1, 2016, https://doi.org/10.6106/KJCEM.2016.17.1.056