Magazine of the Korea Concrete Institute (콘크리트학회지)
- Volume 23 Issue 1
- /
- Pages.56-59
- /
- 2011
- /
- 1018-1415(pISSN)
DOI QR Code
Design and Construction of Keumgang Bridge in Honam High Speed Railway 1-2 Project
호남고속철도 제1-2공구 금강교의 설계 및 시공
- Published : 2011.01.31
Abstract
Keywords