References
- Bolstad, W.M. (2007) "Introduction to Bayesian statistics." 2nd ed. Hoboken: John Wiley & Sons, Inc.
- Christodoulou, S. E. (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neutral networks. Doctoral Dissertation, Columbia University, New York, NY.
- CIOB. (2009) "Code of estimating practice." 7th ed. Chichester: CIOB/Wiley-Blackwell.
- Egan, J. (1998) Rethinking construction-report of the construction task force: www.dti.gov.uk/construction/rethink/report/index. htm
- Elhag, T.M.S., Boussabaine, A.H. & Ballal T.M.A. (2005) "Critical determinants of construction tendering costs: Quantity surveyors.'' International Journal of Project Management, 23(7): 538-545. https://doi.org/10.1016/j.ijproman.2005.04.002
- Grogan, T. (1992) "Low bids raise hidden costs." Engining News- Rec., 228(13): 30-31.
- Hair, J.F.Jr., Anderson, R., Tatham, R., & W.C. "Multivariate data analysis." 5th ed. Upper Saddle River, NJ: Prentice Hall.
- Henriod, E.E., & Lanteran, J.M. (1988) "Trends in contracting practice for civil works." Task Force on Innovative Practice, World Bank, Washington, D.C.
- Hinton P.R., Brownlow C., McMurray I. & Cozens B (2004) "SPSS Explained." New York: Routledge Inc.
- Jaggar, D., Ross, A., Smith, J. & Love P. (2002) "Building design cost management." Oxford: Blackwell Science.
- Kim H.J. & Reinschmdit, K.F. (2011) "Effects of contractors' risk attitude on competition in construction." Journal of Construction Engineering and Management, 137(4): 275-283. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000284
- Laryea, S. & Hughes, W. (2011) "Risk and price in the bidding process of contractors." Journal of Construction Engineering and Management, 137(4): 248-258. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000293
- Lo, W. Lin, C.L. & Yan, M.R. (2007) "Contractor's Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market." Journal of Construction Engineering and Management, 133(6): 409-416. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(409)
- Mochtar, K. & Arditi, D. (2001) "Pricing strategy in the US construction industry." Construction Management and Economics, 19(4): 405-415. https://doi.org/10.1080/01446190010020372
- Nellis, J.G. & Parker, D. (1992) "The essence of business economics." New York ; London : Prentice Hall.
- Seydel, J. (2003) "Evaluating and comparing bidding optimization effectiveness." Journal of Construction Engineering and Management, 129(3): 285-292. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(285)
- Shash, A.A. (1995) "Competitive bidding system." Cost Engineering, 37(2): 19-20.
- Spiegelhalteral, D., Thomas, A., Best, N., & Lunn, D. (2003) "Winbugs user manualatistics Version 1.4." Cambridge, UK; MRC Biostistics Unit.