DOI QR코드

DOI QR Code

A Strategy Bayesian Model to Predict Profit of Construction Projects

  • Park, Sung-Hyuk (School of Construction Management and Engineering, University of Reading) ;
  • Kim, Sang-Yong (School of Construction Management and Engineering, University of Reading)
  • Received : 2011.07.25
  • Published : 2011.09.30

Abstract

Competitive bidding in construction is concerned with contractors making strategic decisions in respect of determination of bid price if contractors opt to bid. This study presents a strategy model for deciding optimum tender price with reflecting appropriate profit in competitive bidding using Bayesian regression analysis (BRA). The purpose of the developed model is to help contractors to secure suitable profitability by predicting the actual profit based on key variables. They may affect construction cost at bidding phase, ultimately which help contractors to secure high quality output. The model was tested empirically by application to a bidding dataset collected from a large South Korea contractor. BRA allows contractors to estimate more accurate actual profit by reflecting not only objective information but also subjective experiences and judgments. Consequently, the model can contribute to improvement of decision-making process for setting an optimum tender price.

Keywords

References

  1. Bolstad, W.M. (2007) "Introduction to Bayesian statistics." 2nd ed. Hoboken: John Wiley & Sons, Inc.
  2. Christodoulou, S. E. (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neutral networks. Doctoral Dissertation, Columbia University, New York, NY.
  3. CIOB. (2009) "Code of estimating practice." 7th ed. Chichester: CIOB/Wiley-Blackwell.
  4. Egan, J. (1998) Rethinking construction-report of the construction task force: www.dti.gov.uk/construction/rethink/report/index. htm
  5. Elhag, T.M.S., Boussabaine, A.H. & Ballal T.M.A. (2005) "Critical determinants of construction tendering costs: Quantity surveyors.'' International Journal of Project Management, 23(7): 538-545. https://doi.org/10.1016/j.ijproman.2005.04.002
  6. Grogan, T. (1992) "Low bids raise hidden costs." Engining News- Rec., 228(13): 30-31.
  7. Hair, J.F.Jr., Anderson, R., Tatham, R., & W.C. "Multivariate data analysis." 5th ed. Upper Saddle River, NJ: Prentice Hall.
  8. Henriod, E.E., & Lanteran, J.M. (1988) "Trends in contracting practice for civil works." Task Force on Innovative Practice, World Bank, Washington, D.C.
  9. Hinton P.R., Brownlow C., McMurray I. & Cozens B (2004) "SPSS Explained." New York: Routledge Inc.
  10. Jaggar, D., Ross, A., Smith, J. & Love P. (2002) "Building design cost management." Oxford: Blackwell Science.
  11. Kim H.J. & Reinschmdit, K.F. (2011) "Effects of contractors' risk attitude on competition in construction." Journal of Construction Engineering and Management, 137(4): 275-283. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000284
  12. Laryea, S. & Hughes, W. (2011) "Risk and price in the bidding process of contractors." Journal of Construction Engineering and Management, 137(4): 248-258. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000293
  13. Lo, W. Lin, C.L. & Yan, M.R. (2007) "Contractor's Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market." Journal of Construction Engineering and Management, 133(6): 409-416. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(409)
  14. Mochtar, K. & Arditi, D. (2001) "Pricing strategy in the US construction industry." Construction Management and Economics, 19(4): 405-415. https://doi.org/10.1080/01446190010020372
  15. Nellis, J.G. & Parker, D. (1992) "The essence of business economics." New York ; London : Prentice Hall.
  16. Seydel, J. (2003) "Evaluating and comparing bidding optimization effectiveness." Journal of Construction Engineering and Management, 129(3): 285-292. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(285)
  17. Shash, A.A. (1995) "Competitive bidding system." Cost Engineering, 37(2): 19-20.
  18. Spiegelhalteral, D., Thomas, A., Best, N., & Lunn, D. (2003) "Winbugs user manualatistics Version 1.4." Cambridge, UK; MRC Biostistics Unit.